Laserfiche WebLink
five-year window, with no ability for administrative extension, we would want to at least post <br />notice to this body that there is a possibility that maybe at the end of the fourth or fifth year they <br />may come in for an extension, and the extension is going to be largely driven by the just overall <br />economic, global economic situation. <br />CARR SMITH: Understood. Okay. Any other comments from you, Mr. Fuke? <br />FUKE: Uh, no. <br />CARR SMITH: Okay. Commissioners, do you have any questions of the applicant? Mike? <br />VITOUSEK: Yeah, well, Sid, I think you're absolutely right about the COVID pandemic and <br />the fact that, you know, we're experiencing that now shows us what, you know, truly is meant by <br />acts that are outside of people's control that are going to affect the outcome and compliance with <br />these type of projectsa hundred percent agree that that's going to happen to a lot of projects. <br />Now, that being said, looking back on the issues identified here for non-compliance, I don't see <br />that being anywhere remotely near the same level of effect and even having the same adverse <br />impact on the developer's ability to construct. Looking at the timing of it, the developer got an <br />extension to complete the conditions in 2012, which expired in 2019. The archaeological work <br />was completed in 2014, which would have given them five years to complete construction during <br />a very strong economic period. So, to me, that, that non-compliance is not the result of things <br />that were outside the control of the developer; they, they just didn't have the money to build the <br />project they proposed. So I think that's one of the things that we have to consider in our role <br />with the Leeward Planning Commission is that we have to identify what is and what isn't a <br />legitimate reason for non-compliance. <br />CARR SMITH: Good point, Mike. Your response? <br />FUKE: Well, I think that if you look at this particular application, applicant, and looking at the <br />myriad of conditions that were imposed way back when, it required a lot of redesign, a lot of <br />archaeological things that needed to be done, not only the, having the completed archaeological <br />inventory survey, but having prepare and getting the burial treatment plan approved, the <br />mitigation plan, and, Mike, I'm sure that you're very aware of, you know, how laborious and <br />time consuming that process, you know, took. <br />VITOUSEK: Oh, yeah, absolutely <br />FUKE: So admittedly, they did <br />VITOUSEK: In this particular case— <br />FUKE: You know they— <br />CARR SMITH: One at a time. <br />6 <br />DRAFT <br />