Laserfiche WebLink
the General Plan. <br />22. Public Access: The property is located more than 1,700 feet from the shoreline and <br />mauka of other resort properties. Existing public accesses to and along the shoreline will <br />not be impacted by the project. <br />PUBLIC UTILITIES AND SERVICES <br />23. Access: The primary proposed access to the project site is from the Mamalahoa Highway <br />Bypass. An existing permitted access connection is available on Mamalahoa Highway <br />Bypass for the property and lands mauka of the Kona Country Club Golf Course. This <br />access connection coincides with an existing unsignalized, channelized intersection and <br />the location of a portion of the project site. The applicant proposed to improve the access <br />from the highway intersection to the proposed residential portion of the project site. The <br />Department of Public Works recommended the construction of a collector roadway from <br />the Mamalahoa Highway Bypass to the project access to County dedicable standards and <br />Condition F of the subject ordinance reflected this requirement. The application indicated <br />that the required roadway construction was complete, although the improvements have <br />not yet been dedicated to the County. However, according to DPW, there are outstanding <br />`punch lists' from the DPW Engineering and Traffic Divisions that need to be satisfied to <br />deem construction complete and eligible for roadway dedication to the County. <br />Condition E of the subject change of zone Ordinance requires plans submitted for Final <br />Plan Approval reflect a minimum ten (10) -foot wide emergency evacuation access route <br />that extends from the project's easterly boundary, through the existing golf course and up <br />to any point along Alii Drive. The emergency access route is required to be improved to <br />an unpaved road, but reasonably compact enough to accommodate vehicles leaving the <br />project site and an access easement recorded prior to issuance of Certificate of <br />Occupancy for the first residential unit within the project area. This emergency access is <br />reflected in the site plan for the proposed 29 -unit development. <br />24. Traffic: The applicant submitted two (2)Traffic Assessments (TA), conducted by Austin, <br />Tsutsumi & Associates for both the current proposed 29 -dwelling unit residential <br />development as well as a TA for a larger, 60 -dwelling unit development currently entitled <br />by density and SMA Use Permit for the project site. According to the latter TA, "The trip <br />-5- <br />