Laserfiche WebLink
in the Keauhou Resort. The subject parcel is currently vacant of any structures or other <br />improvements. The RM zoning and proposed development is consistent with other <br />multiple family/resort type uses in the surrounding area, which include the Kona Country <br />Club mauka golf course to the north and east (zoned Open), open space zoned A -5a west <br />and south of the site, and a future access road to the south. <br />The proposed development will be developed in accordance with the Zoning <br />Code, including the requirement to obtain a new Final Plan Approval, which will ensure <br />appropriate on-site parking, drainage and landscaping requirements will be met. <br />In addition, the proposed amendment meets the concurrency requirements of the <br />Zoning Code which address traffic, potable water, and Civil Defense Siren availability. <br />The applicant submitted two (2)Traffic Assessments (TA), conducted by Austin, <br />Tsutsumi & Associates for both the current proposed 29 -dwelling unit residential <br />development as well as a TA for a larger, 60 -dwelling unit development currently entitled <br />by density and SMA Use Permit for the project site. According to the latter TA, "The trip <br />generation projected for the 60 -unit project indicates that a total of 13 vehicles per hour <br />(vph) are anticipated during the AM commuter peak hour of traffic and a total of 17 vph <br />are anticipated during the PM commuter peak hour of traffic, and thus the Project does <br />not meet the minimum criteria of 50 peak hour trips specified in the Zoning Code's <br />Concurrency Requirements to require a Traffic Impact Analysis Report (TIAR). " <br />As previously stated, the applicant has a water allocation/commitment of sixty <br />(60) units available to the parcel. Condition C of the subject ordinance requires the <br />applicant to construct water improvements outlined in DWS' July 29, 2009 memorandum <br />addressed to the Planning Department prior to obtaining Certificate of Occupancy. <br />However, DWS subsequently submitted a letter outlining additional requirements, <br />including the development of a Water Master Plan to ensure provision of adequate water <br />pressure and volume under peak -flow and fire -flow conditions, and any water <br />improvements required to meet those provisions. Additionally, DWS articulated standard <br />necessary water system improvements, facilities charge amount and remittance <br />instructions, and water improvement conveyance requirements. As the required water <br />system improvements have changed since 2009, the Planning Director is recommending <br />Sim <br />