Laserfiche WebLink
The reasons for approving the rezoning of this site were articulated in the <br />Planning Commission's recommendation to the County Council (Exhibit H). <br />The reasons, in summary, and their relationship to the present, included: <br />® Consistency with the County General Plan LUPAG map and Goals and <br />Policies. <br />Furtherance of the County's goals of providing an economic environment <br />which allows new or existing businesses to expand and diversify the <br />County's economic base, and thereby also increase occupational choices. <br />This is still a goal of the County. <br />Site's. positive physical and locational attributes which meet the <br />commercial needs in the context of the medium density designation of the. <br />County General Plan. This is still applicable today, as there have not been <br />any amendments to the General Plan. <br />o Availability or provision by the Applicant Of all essential utilities and <br />services. The discussion relates to the improvements to the roadway <br />right-of-way, wastewater system, and the like. <br />Site not having any resource issues, such as archaeological, drainage, <br />botanical, or avifaunal. <br />It is thus maintained that the reasons used to support the existing CN -20 <br />zoning still apply to the requested time extension. It should be noted, <br />however, that since the CN -20 zoning was approved in 2010, the only <br />substantive change to the Zoning Code was the adoption of the concurrency <br />provision, Section 25-2-46 and its amendment in 2011. Specifically, it <br />requires that all rezoning, including time extension, address traffic, potable <br />water, and civil defense siren concerns. <br />Relative to traffic, the concurrency provision requires a Traffic Impact <br />Analysis Report ("TM") if more'than fifty (50) trips are generated by a <br />project during the peak hours. In this situation, the proposed office use for the <br />9,000+/- .square foot 2 -story structure would generate less turning movements <br />than a retail shop. According to the Institute of Traffic Engineering manual <br />(the manual used by traffic engineers in preparing Traffic Impact Analysis <br />Report), the AM/PM trip generation for, office use is 1.49 trips per 1,000 <br />square feet. Thus, for a maximum 9,000 square foot office building, the <br />projected movements would be no more than fourteen (14) movements. Thus, <br />the projected use does not reach the TZAR "threshold". <br />County water for the project is still available from the 14 -inch line fronting <br />Komohana Street. That is adequate to address the fire flow requirements. <br />12 <br />