Laserfiche WebLink
applicant shall submit the arAieipated maximum daily water- usage ealeulations <br />with the cc Pokey" <br />to the Department of Water SlIpply <br />within <br />180 days from the off-eet ve date of this or- inane ] A water commitment deposit <br />shall be paid to the Department of Water Supply within 180 days from the effective date <br />of this amended ordinance in accordance with Rule 5 of the Department of Water <br />Supply's Rules and Regulations. The applicant, successors, or assigns are responsible for <br />maintaining valid water commitments to support the proposed use until such time that <br />reauired water facilities charges are paid in full. <br />five (5) feet of the water- meter- on private pr-opeft-y, whieh must be inspeeted and <br />] The applicant, successors, or assigns shall <br />install and construct necessary water system improvements meeting with the <br />reauirements of the Deuartment of Water Sunnly brior to the issuance of a Certificate of <br />Occupancy. <br />D. Construction of the proposed [' ] development shall be completed within <br />[fes] six 6 years from the effective date of this amended ordinance. This time <br />period shall include securing Final Plan Approval from the Planning Director in <br />accordance with Section 25-2-70, Chapter 25 (Zoning Code), Hawaii County Code. <br />Plans shall identify all proposed structure(s), fire protection measures, paved driveway <br />access, parking stalls and loading zones. Landscaping shall be indicated on the plans for <br />the purpose of mitigating any potential adverse noise or visual impacts to adjoining <br />parcels. Landscaping shall be provided in accordance with the requirements of Planning <br />Department's Rule No. 17 (Landscaping Requirements). <br />E. Development of the property shall be designed and constructed in a way to minimize <br />obstruction of the scenic views of Hilo Bay and the Puna shoreline from Komohana <br />Street. <br />-2- <br />