My WebLink
|
Help
|
About
|
Sign Out
Home
COM 1024.001 2018-2020
ClerkCouncil
>
Council Records
>
Communications
>
2018-2020
>
COM 1024.001 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2021 9:43:58 AM
Creation date
8/3/2020 8:40:22 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2018-2020
Communication
1024
Point
001
Author
Michael Yee, Planning Director
Communications - Referred To
PC
Document Relationships
AGE PC 2020/08/18 (2018-2020)
(Related)
Path:
\Council Records\Agendas\2018-2020\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RAFFIPIY: Thank you Go ahead and make your presentation Mr. Fuke. <br />FUKE: Thank you very much Mr. Chairman and members of the Commission. For the record, <br />my name is Sidney Fuke. I am a Planning Consultant. I'm assisting the Applicant who is seated <br />to my right, Dr. Brian Sugai on his requested time extension. <br />HALL: He might need a— <br />AGUINALDO: Sid, try come more close. Try come more close. <br />FUKE: Okay, can you hear me now? <br />AGUINALDO: Yeah, you go it. <br />FUKE: Okay. So. <br />AGUINALDO: Yeah: <br />RAFFIPIY: See if we can turn up th <br />FUKE: Testing, testing. Testing. <br />RAFFIPIY: That's much. better. <br />FUKE: Okay, anyway;^just to resat( <br />Consultant. I'm assislingAthe Applies <br />Sugai who is the Applicant _is seated: <br />100 Pauahi-Streethere in Hilo <br />y naersSidney Fuke. I'm a Planning <br />ling time extension request and Dr, Brian <br />business office is right across the street at <br />E) review and discuss the staff's proposed <br />ditorial change about the amended <br />it's appropriate. I'll like to generally <br />The rezoning vas;approved in20A0, the year 2010 and shortly thereafter Dr. Sugai had <br />aggressively colfi f g ed the plaris� secure Plan Approval, did the required plans for a building <br />permit, submitted it acrd got thcF- -ding permit approved. The building permit did reflect the <br />conditions of the rezoni g_appro aI which you know as Commissioner Replogle just kind of <br />noted about the access restrictions. So, the access restriction clearly shows like only a right turn <br />in and right turn out and thafs a condition of the zone change. So, there is no left turn <br />movement. So, what Ms. Engelhard was raising about the potential traffic complaint would be <br />minimized. It also reflects the construction drawings also reflected curbs, gutters and sidewalks <br />fronting the particular area. <br />So, they were all approved but, in the meantime, you know there were some dispute between the <br />Applicant and the then contractor and a long litigation process. In the meantime, the financing <br />fell apart so on and so forth. Well, that litigation recently was resolved and as the staff had <br />EXHIBIT B (DRAFT - NOT AN OFFICIAL COPY) <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.