Laserfiche WebLink
("SHPD") comments, a revised report was prepared and subsequently <br />submitted to SHPD. (A copy is on file with the Planning Department.) <br />The SHPD, in its letter of August 27, 2008, approved the revised AIS. <br />(Exhibit E) <br />The survey of the subject and surrounding properties consisting of <br />approximately 65 acres identified 64 sites consisting of 138 features. <br />The sites included platforms, terraces, mounds, modified outcrops, <br />caves, C -shapes, walls, plus a historic period roadway and ranching <br />features. The approved AIS noted that "no further work" were needed. <br />for thirty four (34) sites; thirty one (31) sites were required "further data <br />collection"; three (3) burial sites were to be preserved "in place"; while <br />one (1) possible ceremonial site was also recommended preservation <br />"in place." <br />The burial sites (Site Nos. 14091, 14124, and 14132) and the possible <br />ceremonial site (Site No. 14123) are identified on the map identified as <br />"Location of Burial, Preservation, and Data Recovery Sites. (Figure 4) <br />Two (2) of the burial sites and the possible ceremonial site with their <br />proposed 30-f6ot wide buffers are located on the site plan (Figure 3). <br />The other burial site which is not noted on the site plan is located on <br />the same parcel as the possible ceremonial site. You will note that the <br />two (2) burial sites with their with their proposed buffers are situated <br />entirely on an adjoining parcel, whereas only a small area of the <br />proposed buffer area of the possible ceremonial site falls within the <br />subject site. In that area, residential uses are being proposed. <br />At the appropriate time, the applicant or affected landowner intends to <br />prepare the appropriate Burial Treatment Plan ("UP") and preserve <br />the burials as is. Likewise, the applicant will have a Preservation Plan <br />("PP") for the possible ceremonial feature prepared. The site plan will <br />be adjusted, if needed, to accommodate the requirements of the PP. <br />The burial sites with their possible buffers and possible ceremonial <br />sites are located on the site plan (Figure 3). <br />Notwithstanding the above, the existing condition already requires that <br />the project design accommodate the requirements of the approved <br />BTP and PP in the form of buffers, access, construction protocols, and <br />the like. All of this will be done prior to issuance of Final Plan <br />Approval. As such, the condition provides adequate protection and <br />accommodation of any cultural and archaeological features within <br />and/or proximate to the subject site. <br />U. Should any remains of historic sites such as rock walls, terraces, <br />platforms, marine shell concentrations or human burials be <br />encountered, work in the immediate area shall cease and the <br />14 <br />