My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 201 Draft 02 2018-2020
ClerkCouncil
>
Council Records
>
Bills
>
2018-2020
>
BIL 201 Draft 02 2018-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 10:35:49 AM
Creation date
11/27/2020 2:55:21 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2018-2020
Bill/Resolution
201
Draft
02
Introducer
Ashley L. Kierkiewicz, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 201, Draft 2, passes first reading; adopts PC-57 - 11/18/20
Action 2
Council: Bill 201 Draft 2, amended to Drft 3, 12/23/20
Reading Number
1
Reading Date
11/18/2020
Ayes
9-Chung, David, Eoff, Kaneali'i-Kleinfelder, Kierkiewicz, Lee Loy, Poindexter, Richards, Villegas
Noes
0
Absent
0
Excused
0
Document Relationships
AGE COUNCIL 2020-12-23 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
COM 1078.003 2018-2020
(Related To)
Path:
\Council Records\Communications\2018-2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the State Department of Health before the commencement of construction <br /> activities. <br /> P. All development-generated runoff shall be disposed of on site and shall not be <br /> directed toward any adjacent properties. <br /> Q. The applicant shall perform an engineering study to determine if the sewer line <br /> has adequate capacity to handle the proposed flows. If the offsite sewer line does <br /> not have adequate capacity, the applicant shall be responsible for necessary <br /> improvements. Sewer lines shall be installed within the development to connect <br /> with the County's sewer system, meeting with the approval of the Department of <br /> Environmental Management, and prior to the Issuance of a Certificate of <br /> Occupancy. <br /> R. A Solid Waste Management Plan shall be submitted to the Department of <br /> Environmental Management for review and approval prior to the issuance of a <br /> Certificate of Occupancy. <br /> S. A Data Recovery Plan and/or an Archaeological Preservation and Burial <br /> Treatment Plan, if required, shall be submitted for the review and approval of the <br /> [Planning Difeete in eensultation •+i +i ] Department of Land and Natural <br /> Resources— State Historic Preservation Division (DLNR-SHPD). Proposed <br /> mitigation treatment for the burial sites, within the subject property shall be <br /> approved by the SHPD's [14awaii] Hawaii Island Burial Council before detailed <br /> mitigation plans are finalized for these sites. A copy of the approved Final <br /> Archaeological Preservation and Burial Treatment Pian shall be submitted to the <br /> Planning Director for its files prior to submitting plans for Final Plan Approval <br /> review or prior to the issuance of any land alteration permits, whichever occurs <br /> first. <br /> T. [Should afty femains of histefie sites, stieh as feek walls, teffaees, <br /> , <br /> wofk in <br /> State Histafie Preservation Division (I)LNR S14PD) shall be iffifnediate4y <br /> notified. Subsequent wafk shall pr-eeeed upon an afehaeole ieal elear-anee ffem <br /> DLNR S14PD when it finds that stiffieient mitigation measufes have been .] <br /> In the unlikely event that surface or subsurface historic resources, including <br /> human skeletal remains, structural remains (e.g. rock walls, terraces, platforms <br /> etc.), cultural deposits, marine shell concentrations, sand deposits or sink holes <br /> are identified during the demolition and/or construction work, cease work in the <br /> immediate vicinity of the find, protect the find from additional disturbance and <br /> contact the State Historic Preservation Division at (808) 933-7651. Subsequent <br /> work shall proceed upon an archaeological clearance from DLNR-SHPD when it <br /> finds that sufficient mitigation measures have been taken. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.