Laserfiche WebLink
Prosect Experience <br />o City and County of Honolulu, Department of Transportation Services (DTS) Projects, <br />Construction Management Services, 2011-2014 <br />1. WaipiwPoint Access Road Improvements Project <br />• ROLE: Project Engineer <br />• SCOPE: Construction Management Services for the resurfacing and <br />reconstruction of existing roadway pavement, installation of shared use <br />path, installation of drainage improvements, and relocation of existing <br />trees and fence. <br />2. Kalaeloa Boulevard Improvements Project <br />• ROLE: Project Engineer <br />• SCOPE: Construction Management Services for the resurfacing and, <br />reconstruction of existing roadway pavement, relocation of existing <br />utilities, installation of traffic signal and streetlights, and installation of <br />curb and sidewalks <br />o State of Hawaii, Department of Transportation - Highways Division, District of Hawaii <br />Open Ended CM/CS Services, 2014 -Present <br />1. Installation of Pavement Preservation Strategies and Surface Treatments at <br />Various Locations <br />• ROLE: Project Engineer <br />• SCOPE: Construction Management Services for the resurfacing and <br />reconstruction of existing roadway pavement. <br />2. Installation of Enhanced Pavement Marking and New Milled Rumble Strip at <br />VariouIs Locations <br />• ROLE: Project Engineer <br />• SCOPE: Construction Management Services for the removal and <br />installation of pavement striping, marking, and rumble strips. <br />3. Emergency Projects, Kilauea Lava Event, (Hilo, HI) <br />• ROLE: Project Engineer <br />• SCOPE: Construction management support services for repairs and <br />maintaining project records for the required repairs due to damages to <br />the highways caused by reactions to the Kilauea Lava Event of 2018 <br />(earthquakes, steam vents caused by underground lava tubes). <br />4. Emergency Projects, Hurricane Lane, (Hilo, HI) <br />• ROLE: Project Engineer <br />• SCOPE: Construction management support services for repairs and <br />maintaining project records for the required repairs due to damages by <br />Hurricane Lane in 2018 (landslides, drain damages due to flooding, <br />pavement and bridge erosion due to flooding). <br />