My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0050.001 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0050.001 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2021 2:32:30 PM
Creation date
1/7/2021 8:24:18 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0050
Point
001
Author
Zendo Kern, Planning Director
Communications - Referred To
PC
Document Relationships
AGE PC 2021/02/02 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
And this relates to the traffic study that has been done that is referred to; the traffic study is four <br /> years old, it's already outdated. And that it sounds as though they won't commit to when they <br /> are going to start to build. There will be 10 or 20 years before this place is built out with <br /> thousands of additional cars. So I would suggest that we require another traffic study when <br /> construction begins, which could be 20, 30 years after the original approval. Another traffic <br /> study—in fact, I think they should return after, let's say, 20 years from the original application to <br /> address all of the increased infrastructure needs. <br /> CARR SMITH: Thank you. Perry? Max? Barbara? Any questions? Barbara, go ahead. <br /> DEFRANCO: I can't, I can't tell if Sid is trying to talk to us - - - <br /> CARR SMITH: No, he - - -he might be talking- - -no, he's not. <br /> COLON: He's talking to one of the other, one of,he's talking to Roger, so whatever he has to <br /> say— <br /> CARR SMITH: Yeah, he's— <br /> COLON: —couple rooms over, we'll find out soon. <br /> DEFRANCO: Okay, and in the CDP the way that it views this in open space and parks and, you <br /> know, I have to agree with both other commissioners in a way, you know; it's going to be a <br /> bigger demand by the time they get around to completing the park. Why not, you know, do <br /> some infrastructure before you hand it over to the county, that extra 10 acres? Maybe it isn't a <br /> full buildout, and maybe we can meet in the middle there. But, you know, we are looking to the <br /> future of things and, yes, we need the schools and the housing first, I agree with that, but also <br /> these kids are going to need a place to be, you know. And the more that we can provide that now <br /> by putting it in here now, I think long term is, is an idea that we should look at them a little bit. <br /> Thank you. <br /> CARR SMITH: Thank you, Barbara. Max or Perry? <br /> KEALOHA: I guess my interest is in the main roadway coming down from Mdkdlei Drive. Is <br /> there any real intention of making a connection from the mauka highway to Queen Ka'ahumanu? <br /> CARR SMITH: Who wants to—Roger? Roger, I've got you on two windows here. <br /> HARRIS: Okay, can you see, can you hear me? <br /> CARR SMITH: Yeah, I can see you a lot—yeah, I can hear you, go ahead. <br /> HARRIS: Okay. With respect to the park—I was just talking to Sid Fuke on the phone—part of <br /> the reason for the second phase of the park was that the county, Pete Hoffmann, and the Parks <br /> department, were looking at putting a big regional park at Kealakehe, and this would,by adding <br /> 29 <br /> DRAFT <br />
The URL can be used to link to this page
Your browser does not support the video tag.