My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0050.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0050.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 4:23:57 PM
Creation date
1/7/2021 8:48:40 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0050
Point
000
Author
Mitchell D. Roth, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2021-02-17 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE COUNCIL 2021-03-03 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE PC 2021/02/02 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
BIL 010 Draft 01 2020-2022
(Related To)
Path:
\Council Records\Bills\2020-2022
REP PC 009 2021/02/02 (2020-2022)
(Related)
Path:
\Council Records\Reports\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at a rate of approximately$4-5 million each year. The Palamanui Business Park is <br /> anticipated to accommodate approximately 75-95 businesses. Parking will be provided on <br /> the individual lots as required by the Zoning Code. Palamanui, the master developer, will <br /> provide subdivision improvements including curb, gutter, sidewalks, and on-street <br /> parking. <br /> The non-performance is the result of conditions that could not have been <br /> foreseen or are beyond the control of the applicants, successors or assigns, and that <br /> are not the result or their fault or negligence. Since August 2013, the applicant has <br /> been consistently meeting with the Planning Department through its Kona CDP Design <br /> Center and has spent considerable time and money to create an updated Master Plan or <br /> "Regulating Plan", which in 2019 was determined by the Design Center to be consistent <br /> with the Kona CDP. According to the applicant's "Regulating Plan" submitted with a <br /> concurrent request to amend Project district Ordinance No. 09 132, development of the <br /> Business Park will occur during Phase III-IV. <br /> Because development of the Business Park is not anticipated to begin until Phase <br /> III of the overall Palamanui Development, the Planning Director recommends providing a <br /> ten(10)-year time extension to secure final subdivision approval rather than the standard <br /> five years requested by the applicant. Additionally, to ensure connectivity between the <br /> University Village and Business Park, the Planning Director recommends University <br /> Drive between Queen Ka`ahumanu Highway and Ane Keohokalole Highway and the <br /> University Drive-Queen Ka`ahumanu Highway intersection be completed prior to final <br /> subdivision approval. <br /> Since the MCX zoning was approved in 2009, the applicant has taken several <br /> steps in developing the property in accordance with the terms or conditions of approval, <br /> including providing road, water and electrical infrastructure, preparing a water master <br /> plan, rough grading University Drive, which provides access to the rezone area, and <br /> implementing the Integrated Natural Cultural Resource Management Plan to preserve <br /> natural and cultural resources on the property. Thus, the non-performance is the result of <br /> conditions that could not have been foreseen and were beyond the control of the <br /> applicant. <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.