Laserfiche WebLink
i <br /> DocuSign Envelope ID:36908555-2D80-4AE9-BE09-C9FE47FACAC4 <br /> I <br /> I <br /> Aaron S.Y. Chung, Council Chair j <br /> and Members of the County Council <br /> County of Hawaii <br /> Page 2 <br /> I <br /> I <br /> I <br /> The 29.92-acre rezone area is a portion of an approximately 70-acre area titled <br /> "Palamanui Business Park" under the Project District designation of the Palamanui Development <br /> on the subject property. The applicant plans to use the area for wholesaling and distribution <br /> uses, which the Project District zoning does not permit. The 29.92-acre area is proposed to be <br /> subdivided into approximately 35± lots ranging in size from 20,000 to 62,000 square feet to sell <br /> or develop into uses permitted under the MCX zoning. The applicant anticipates developing <br /> distribution and wholesaling uses, as well as retail and office uses on the site. A mix of buildings <br /> from 5,000 square feet to 40,000 square feet is anticipated. The cost of the initial improvements <br /> is estimated at approximately $3 million. Individual projects on the lots will be constructed in <br /> the future at a rate of approximately $4-5 million each year. The Palamanui Business Park is <br /> anticipated to accommodate approximately 75-95 businesses. Parking will be provided on the <br /> individual lots as required by the Zoning Code. Palamanui, the master developer, will provide <br /> subdivision improvements including curb, gutter, sidewalks, and on-street parking. <br /> The non-performance is the result of conditions that could not have been foreseen or <br /> are beyond the control of the applicants, successors or assigns, and that are not the result <br /> or their fault or negligence. Since August 2013, the applicant has been consistently meeting <br /> with the Planning Department through its Kona CDP Design Center and has spent considerable <br /> time and money to create an updated Master Plan or "Regulating Plan", which in 2019 was <br /> determined by the Design Center to be consistent with the Kona CDP. According to the <br /> applicant's "Regulating Plan" submitted with a concurrent request to amend Project district <br /> Ordinance No. 09 132, development of the Business Park will occur during Phase III-N. <br /> Because development of the Business Park is not anticipated to begin until Phase III of <br /> the overall Palamanui Development, the Planning Director recommends providing a ten (10)- <br /> year time extension to secure final subdivision approval rather than the standard five years <br /> requested by the applicant. Additionally, to ensure connectivity between the University Village <br /> and Business Park, the Planning Director recommends University Drive between Queen <br /> Ka`ahumanu Highway and Ane Keohokalole Highway and the University Drive-Queen <br /> Ka`ahumanu Highway intersection be completed prior to final subdivision approval. <br /> Since the MCX zoning was approved in 2009, the applicant has taken several steps in <br /> developing the property in accordance with the terms or conditions of approval, including <br /> providing road, water and electrical infrastructure, preparing a water master plan, rough grading <br /> University Drive, which provides access to the rezone area, and implementing the Integrated <br /> Natural Cultural Resource Management Plan to preserve natural and cultural resources on the <br /> property. Thus, the non-performance is the result of conditions that could not have been foreseen <br /> and were beyond the control of the applicant. <br /> Approval of this request is not be contrary to the General Plan or Zoning Code nor <br /> with the original reasons for granting the Change of Zone. There have not been any <br /> significant changes to the General Plan for this area since the change of zone was approved in <br /> 2009. At that time, the General Plan LUPAG Map designation for the property was the same <br />