My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2021-027 2020-2022
ClerkCouncil
>
Council Records
>
Ordinances
>
2021
>
ORD 2021-027 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 4:21:44 PM
Creation date
4/1/2021 3:57:08 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2020-2022
Year
2021
Ordinance
027
Effective Date
3/31/2021
Document Relationships
BIL 011 Draft 02 2020-2022
(Related)
Path:
\Council Records\Bills\2020-2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shall be responsible for the first $5,000,000 and the University shall be <br />responsible for the balance. <br />(a) The building shall be constructed on the State land designated for <br />University use. <br />(b) Construction of the building shall commence as soon as the <br />University has the required necessary consents and approvals. If <br />the necessary consents and approvals cannot be obtained by the <br />State, the University shall have the right to lease from Applicant <br />appropriate space to house University of Hawaii at West Hawaii <br />until the necessary consent and approvals are obtained at <br />comparable lease rates now being paid by the University of <br />Hawaii until the 20,000 square foot building can be constructed <br />on the State land at Applicant's expense. <br />(c) Applicant shall commence construction of the building, or assure <br />its construction by a bond or other security accepted by the <br />Planning Director and the Chancellor of Hawaii Community <br />College, before the issuance of a certificate of occupancy for any <br />building, other than the State Department of Education (DOE) <br />building, or final subdivision approval for any subdivision creating <br />single-family residential lots. <br />(d) Applicant shall complete construction of the University building <br />no later than two (2) years after the issuance of a certificate of <br />occupancy for any building, other than the DOE building, or <br />November 1, 2012, or final subdivision approval for any <br />subdivision creating single-family residential lots, whichever <br />occurs first. The location and design of the building (interior and <br />exterior) and related improvements will be on terms determined by <br />-23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.