My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0311.001 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0311.001 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 11:50:28 AM
Creation date
8/10/2021 8:59:51 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0311
Point
001
Author
Ramzi I. Mansour, Director of Department of Environmental Management
Communications - Referred To
COUNCIL
Comments
Council: Filed - 8/1/21
Document Relationships
AGE COUNCIL 2021-08-18 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. 3430. 02' 28" 1094.77 feet along Grant 2030 to <br /> Kaiakoili and Lot B, name <br /> being a portion of Grant 2030 <br /> to Kaiakoili to a 1/2° pipe <br /> in concrete (fed) ; <br /> • <br /> Boundary follows along the <br /> middle of atone wall, name -- <br /> being along Grunt 2942 to <br /> Hulikoa for the next three <br /> (3) courses, the direct <br /> azimuth and distance between <br /> said middle of stone wall <br /> being: <br /> 16. 71° 27' 50" 120.74 feet; <br /> 17. 73° 45' 25.67 feet; <br /> 18. 730 14' 52.58 feet to a 1/2° pipe in <br /> concrete '(fnd); <br /> 19. 344° 45' 40" 252.51 feet along a portion of Grant <br /> 2942 to Hulikoa to a nail in <br /> concrete (fnd); <br /> Boundary follows along the <br /> middle of atone wall, same <br /> being along Grant 2942 to <br /> Hulikoa for the next eight <br /> • (8) coureea, the direct <br /> azimuth and distance between <br /> said middle of stone wall <br /> being: <br /> 20. 2310 28' 30" 50.60 . feet to a nail on concrete <br /> (fed) ; <br /> 21. 244° 41' 19.06 feet to a nail in concrete <br /> (End) : <br /> 22. 250° 32' 25.05 feet to a 1/2" pipe in <br /> concrete (fnd); <br /> 23. 262° 21' 30" 45.45 feet; <br /> 24. 2560 24' 30° 33.01 feet; <br /> 25. 255° 05' 30° 29.30 feet; <br /> 26. 165° 13' 30" 5.89 feet; <br /> 27 273° 01' 8.80 feet; <br /> 28. 343° 02' 28° 191.65 feet along a portion of Grant <br /> 2030 to Kaiakoili, <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.