Laserfiche WebLink
i <br /> i <br /> Mr. Zendo Kern, Director <br /> August 16, 2021 <br /> Page 2 <br /> further that if there is no line within that radius,the lots must comply with the <br /> requirements of the State Department of Health. In either event,the applicant intends <br /> to comply with prevailing wastewater requirements of the State Department of <br /> Health. <br /> The comments also outlined other construction-related permitting requirements, <br /> which included the National Pollution Discharge Elimination System(NPDES) <br /> permit. This permit will be secured prior to the installation of any drywells or <br /> drainage related improvements related to the discharge of storm water associated with <br /> the project. The construction noise and dust control measures will be adhered to by <br /> the contractor during the construction phase of this project. <br /> We trust that the above adequately responded to the comments. If not or if there are <br /> further questions or comments,please feel free to contact me. Thank you very much. <br /> incerely <br /> SIDNEY M.FUKE <br /> Planning Consultant <br /> Copy—Dr. Brice Takata, Takata Dental Health Center. Inc.via email <br />