My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0474.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0474.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2021 10:45:49 AM
Creation date
10/28/2021 2:02:28 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0474
Point
000
Author
Mitchell D. Roth, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2021-12-08 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE COUNCIL 2021-12-22 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE PC 2021/11/17 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
BIL 090 Draft 01 2020-2022
(Related To)
Path:
\Council Records\Bills\2020-2022
REP PC 035 2021/11/17 (2020-2022)
(Related To)
Path:
\Council Records\Reports\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> i <br /> Mr. Zendo Kern, Director <br /> August 16, 2021 <br /> Page 2 <br /> further that if there is no line within that radius,the lots must comply with the <br /> requirements of the State Department of Health. In either event,the applicant intends <br /> to comply with prevailing wastewater requirements of the State Department of <br /> Health. <br /> The comments also outlined other construction-related permitting requirements, <br /> which included the National Pollution Discharge Elimination System(NPDES) <br /> permit. This permit will be secured prior to the installation of any drywells or <br /> drainage related improvements related to the discharge of storm water associated with <br /> the project. The construction noise and dust control measures will be adhered to by <br /> the contractor during the construction phase of this project. <br /> We trust that the above adequately responded to the comments. If not or if there are <br /> further questions or comments,please feel free to contact me. Thank you very much. <br /> incerely <br /> SIDNEY M.FUKE <br /> Planning Consultant <br /> Copy—Dr. Brice Takata, Takata Dental Health Center. Inc.via email <br />
The URL can be used to link to this page
Your browser does not support the video tag.