My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2022-002 2020-2022
ClerkCouncil
>
Council Records
>
Ordinances
>
2022
>
ORD 2022-002 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 11:56:13 AM
Creation date
1/14/2022 11:55:22 AM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2020-2022
Year
2022
Ordinance
002
Effective Date
1/11/2022
Document Relationships
BIL 090 Draft 01 2020-2022
(Related)
Path:
\Council Records\Bills\2020-2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Construction of the proposed development, as substantially represented by the <br /> applicant or as permitted by the zoning district classification, shall be completed <br /> within five (5) years from the effective date of this amended ordinance. Prior to <br /> construction, the applicant, successors or assigns shall secure Final Plan Approval <br /> for the proposed development from the Planning Director in accordance with <br /> Section 25-2-70, Chapter 25 (Zoning Code), Hawai`i County Code. Plans shall <br /> identify all existing and/or proposed structures, paved driveway access and <br /> parking stalls associated with the proposed development. Landscaping shall be <br /> indicated on the plans for the purpose of mitigating any adverse noise or visual <br /> impacts to adjacent properties in accordance with the requirements of Planning <br /> Department's Rule No. 17 (Landscaping Requirements) and Chapter 25 (Zoning <br /> Code), Hawai`i County Code. <br /> C. [' ': - - ' .. - - - . .. . - - - - - - - . - -- - -- - - - <br /> prepared by a professional engineer licensed in the State of Hawai`i, and a water <br /> commitment deposit in accordance with the "Water Commitment Guidelines <br /> Policy"to the Department of Water Supply within 180 days from the effective <br /> . - : . : :'-. - -.] Should the applicant, successors or assigns develop a use <br /> other than the proposed dental office use, the applicant shall submit the <br /> anticipated maximum daily water usage calculations as prepared by a professional <br /> engineer licensed in the State of Hawai`i to the Department of Water Supply. If <br /> required, a water commitment deposit shall be paid prior to receipt of Final Plan <br /> Approval for the proposed use in accordance with Rule 5 of the Department of <br /> Water Supply's Rules and Regulations. The applicant is responsible for <br /> maintaining valid water commitments to support the proposed use until such time <br /> that required water facilities charges are paid in full. <br /> D. The applicant shall install a reduced pressure type backflow prevention assembly <br /> within five (5) feet of the existing water meter and any additional water meters on <br /> -2- <br />