My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0601.001 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0601.001 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 12:36:14 PM
Creation date
1/21/2022 4:06:21 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0601
Point
001
Author
Zendo Kern, Planning Director
Communications - Referred To
PC
Document Relationships
AGE PC 2022/02/08 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
AGE PC 2022/02/22 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
AGE PC 2022/03/08 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The applicant has secured easement rights from JPL Hawai`i to access that portion of the <br /> proposed sub-area L2. Again, this is just conceptual plans that were provided to the Planning <br /> Department by the applicant. <br /> KAY: Okay. Alright, so for areas B and C, the applicant is requesting the following: a Special <br /> Management Area Use Permit to allow the development of 900 multi-family timeshare units, <br /> community support facilities including community centers, sales and meeting facilities, and a <br /> convenience commercial center, golf support facilities including the relocation of the golf <br /> clubhouse and existing driving range, two public parks and pathways and related improvements <br /> within approximately 133.8 acres. And second, to allow the development of a new brackish <br /> water irrigation source and distribution system to support the landscape irrigation needs of the <br /> project area within 3.1 acres of land identified as "Area C". Secondly, the applicant is requesting <br /> a Change of Zone for"Area B" from the existing Open and Multiple-Family four, six, and eight <br /> designations, as well as Village Commercial 10,000 square feet to a Project District zoning <br /> district for, again, the 133.822 acres of land identified as "Area B". As the brackish water <br /> irrigation system can be developed in the Open zoning area, there's no,there's, it's not necessary <br /> to have an associated change of zone there. <br /> Again,this is just a indication of the zoning. We've got the Village Commercial and the <br /> Multiple, Multiple-Family Residential zoning as indicated in the brown and yellow color, as well <br /> as the existing Open zoning and all of that area will be rezoned into a Project District zoning. <br /> And again, this slide shows the conceptual site plan for"Area B". For reference, Waikoloa <br /> Beach Drive is running generally toward the top of the slide and its access is intended to be at <br /> two points along that roadway. Here, coming into the bottom of"Area B" and looping through <br /> toward the top of Waikoloa Beach Drive. Again, conceptually there showing about 17 two-story <br /> buildings to house the 900 additional timeshare units, as well as general location of a main and <br /> possible secondary community center in these areas. The operation center is conceptually located <br /> here to the left of the screen, and thenew golf facilities will be located here toward the bottom of <br /> the screen. Again,this area will also include two, what the applicant is referring to as Gateway <br /> Parks. These parks are shown here conceptually on this slide, and these are at the intersection of <br /> Waikoloa Beach Drive and Ala Ihi Way, and again the amenities will be both active and passive <br /> recreational amenities with some parking, looks like a proposed playground area, and then their <br /> proposed 8-foot-wide pedestrian pathway that would link Waikoloa Beach Drive north to <br /> Waikoloa Beach Drive's south within "Area B". And the intent is to connect that pathway <br /> through the Gateway Parks to the other pedestrian facilities that link this portion of the resort to <br /> the makain portion of the resort and down to `Anaeho`omalu Bay and the other natural and <br /> cultural resources and attractions. <br /> The applicant stated reasons for the request are as follows. According to the applicant's demand <br /> for golf at the King's Course has significantly diminished over the last,20 years despite an <br /> overall increase in resort visitor traffic. The new SMA Use Permits would allow the development <br /> of the proposed new facilities and amenities to upgrade, repair, maintain, and operate existing or <br /> future facilities within the Kumu Hou project area and the new SMA Use Permits would also <br /> support separate governance structures and conditions that would be relevant to different <br /> development plans and different owners of pieces of the property anticipated for each of the <br /> three sub-areas to be undertaken over an extended period of time. And finally, the Change of <br /> 10 <br /> EXHIBIT D <br />
The URL can be used to link to this page
Your browser does not support the video tag.