My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 115 Draft 01 2020-2022
ClerkCouncil
>
Council Records
>
Bills
>
2020-2022
>
BIL 115 Draft 01 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2022 9:01:53 AM
Creation date
1/27/2022 9:15:14 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2020-2022
Bill/Resolution
115
Draft
01
Introducer
Ashley L. Kierkiewicz, Council Member
Referred To
PC
Action 1
PC: Bill 115 postponed to February 22, 2022 - 02/08/22
Action 2
PC: Bill 115 postponed to March 8, 2022 - 02/22/22
Action 3
PC-49: Bill 115 amended to Draft 2 - 03/08/22
Action 4
Council: Bill 115 amended to Draft 2 - 3/23/22
Document Relationships
AGE PC 2022/02/08 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
AGE PC 2022/02/22 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
AGE PC 2022/03/08 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
COM 0601.000 2020-2022
(Related)
Path:
\Council Records\Communications\2020-2022
REP PC 049 2022/03/08 (2020-2022)
(Related)
Path:
\Council Records\Reports\2020-2022\Planning Committee (PC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
appropriate governmental agencies prior to issuance of a building permit for any <br /> use in the Kumu Hou Project District. <br /> K. All residential, commercial, community use facilities, golf course support <br /> facilities and timeshare operations facilities shall connect to the Waikoloa Beach <br /> Resort Wastewater Treatment Plant, meeting with the approval of the appropriate <br /> governmental agencies. As represented by the Applicant, all development related <br /> wastewater shall be treated to an R-1 (tertiary) water quality standard and shall be <br /> used for irrigation of landscaping or other beneficial reuse to the maximum extent <br /> feasible. <br /> L. Puakala Place shall be extended to the adjacent property to the north within the <br /> existing right-of-way easement, which may be adjusted to accommodate <br /> topographic or development requirements. This minimum resort standard road <br /> shall be constructed meeting with the approval of the Department of Public Works <br /> and in conjunction with any development within the area requiring access from <br /> Puakala Place,but in any event no later than completion of a road on the adjacent <br /> property to the north or prior to issuance of a certificate of occupancy of any unit <br /> within the Kumu Hou at Waikoloa project. Said roadway, upon completion, shall <br /> be available for public use. <br /> M. The interior roadway requirements for the Kumu Hou Project District may be <br /> designed to resort standards as allowed by the Subdivision Code. <br /> N. The Applicant shall disclose to all potential buyers of lots or units within the <br /> proposed project that internal infrastructure and community facilities shall be <br /> developed and maintained privately and that the County is not obligated to <br /> construct any public facilities within the project area. <br /> -26- <br />
The URL can be used to link to this page
Your browser does not support the video tag.