|
Annual Revenue Report - Fees, Rates & Other Charges
<br /> Charge Frequency Date of Most
<br /> Fund Account No. Account Title Department/Division Description Charge (Annual,Monthly,Per Charge Authorization(Rules, Recent Recent Adjustment
<br /> Amount Most Total Revenues
<br /> Charter,etc.) FY21
<br /> Use,etc.) Adjustment
<br /> Electric Furnaces:
<br /> electric furnace,CCT up to 12 kw $ 8.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> electric furnace,CCT over 12 to 24 kw $ 10.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> electric furnace,CCT over 24 to 48 kw $ 12.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> electric furnace,CCT over 48 to 96 kw $ 14.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> electric furnace,CCT over 96 kw $ 16.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> Infra-red heat-treating and paint baking:
<br /> IR heat-treat/paint bake,CCT up to 5 kw $ 6.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> IR heat-treat/paint bake,CCT over 5 to 15 kw $ 8.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> IR heat-treat/paint bake,CCT over 15 to 50 kw $ 10.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> IR heat-treat/paint bake,CCT over 50 to 100 kw $ 16.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> IR heat-treat/paint bake,CCT over 100 kw $ 4.00 Per Unit HCC§9-40(h)2 Adopted 1994 N/A
<br /> Laundry Dryer Circuit:
<br /> Single/Multi Dwelling,Apartment laundry dryer CCT $ 6.00 Per Unit HCC§9-40(i) Adopted 1994 N/A
<br /> Commercial Laundry Dryer CCT $ 4.00 Per Unit HCC§9-40(i) Adopted 1994 N/A
<br /> High Potential Gas Tube Lighting and Signs: Per Unit
<br /> gas tube lighting/signs,sign/decor outline tube $ 6.00 Per Unit HCC§9-40(j) Adopted 1994 N/A
<br /> gas tube lighting/signs,not fluorescent lighting $ 4.00 Per Unit HCC§9-40(j) Adopted 1994 N/A
<br /> gas tube lighting/signs,flasher in a new sign $ 4.00 Per Unit HCC§9-40(j) Adopted 1994 N/A
<br /> gas tube lighting/signs,flasher on existing sign $ 6.00 Per Unit HCC§9-40(j) Adopted 1994 N/A
<br /> gas tube lighting/signs,reconnect,new location $ 6.00 Per Unit HCC§9-40(j) Adopted 1994 N/A
<br /> gas tube lighting/signs,reconnect,same location $ 6.00 Per Unit HCC§9-40(j) Adopted 1994 N/A
<br /> Temporary Lights. Per Unit HCC§9-40(k) N/A
<br /> temp lights,up to 50 lamps $ 8.00 Per Unit HCC§9-40(k) Adopted 1994 N/A
<br /> temp lights,over 50 to 100 lamps $ 14.00 Per Unit HCC§9-40(k) Adopted 1994 N/A
<br /> temp lights,each 100 lamps over 100 lamps $ 6.00 Per Unit HCC§9-40(k) Adopted 1994 N/A
<br /> Permanent Decorative Lighting,etc.:
<br /> perm decor lighting,up to 100 sockets $ 12.00 Per Unit HCC§9-40(I) Adopted 1994 N/A
<br /> perm decor lighting,each 50 over 100 sockets $ 8.00 Per Unit HCC§9-40(I) Adopted 1994 N/A
<br /> lighting fixtures,set of 10(CCT wiring excluded) $ 8.00 Per Unit HCC§9-40(I) Adopted 1994 N/A
<br /> Motors
<br /> -For each separate motor fixed:
<br /> motor,up to 1/3 HP $ 4.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> motor,over 1/3 to 1 HP $ 6.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> motor,over 1 to 3 HP $ 8.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> motor,over 3 to 8 HP $ 10.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> motor,over 8 to 15 HP $ 12.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> motor,over 15 to 50 HP $ 14.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> motor,over 50 to 100 HP $ 16.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> motor,over 100 HP $ 40.00 Per Unit HCC§9-40(0) Adopted 1994 N/A
<br /> -Temporary Motors,Installation:
<br /> temp motor,installation of first 2 CCTs $ 12.00 Per Unit HCC§9-40(p) Adopted 1994 N/A
<br /> temp motor,installation of each addl CCT $ 8.00 Per Unit HCC§9-40(p) Adopted 1994 N/A
<br /> temp motor,installs for carnival rides,etc. $ 50.00 Per Unit HCC§9-40(p) Adopted 1994 N/A
<br /> Generators,Capacitors,Reactors,Transformers Fixed,and all other alternate energy power sources:
<br /> alternate energy power source,up to 5 kw $ 10.00 Per Unit HCC§9-40(q) Adopted 1994 N/A
<br /> alternate energy power source,over 5 to 15 kw $ 24.00 Per Unit HCC§9-40(q) Adopted 1994 N/A
<br /> alternate energy power source,over 15 kw $ 40.00 Per Unit HCC§9-40(q) Adopted 1994 N/A
<br />
|