My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 115 Draft 03 2020-2022
ClerkCouncil
>
Council Records
>
Bills
>
2020-2022
>
BIL 115 Draft 03 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2022 1:13:18 PM
Creation date
3/28/2022 3:44:52 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2020-2022
Bill/Resolution
115
Draft
03
Introducer
Ashley L. Kierkiewicz, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 115, Draft 3 passes firt reading; adopts PC-49 - 3/23/22
Action 2
Council: Bill 115 Draft 3, amended to Draft 4 - 4/6/22
Reading Number
1
Reading Date
3/23/2022
Ayes
6-Chung, Kaneali'i-Kleinfelder, Kierkiewicz, Kimball, Lee Loy, Richards
Noes
3-David, Inaba, Villegas
Absent
0
Excused
0
Document Relationships
AGE COUNCIL 2022-04-06 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
COM 0601.019 2020-2022
(Related)
Path:
\Council Records\Communications\2020-2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(B) Fulfillment of the need for public service demands created by the <br /> proposed use. <br /> A. The applicant(s), its successor(s), or assign(s) (Applicant) shall be responsible for <br /> complying with all of the stated conditions of approval. <br /> B. The Applicant shall comply with all conditions of the State Land Use Decision <br /> and Order (Docket No. A89-637) or any amendments thereto and the concurrent <br /> SMA Use Permit. <br /> C. This project area shall be called the Kumu Hou Project District. <br /> D. The Kumu Hou Project District shall consist of not more than 133.822 acres of <br /> land for multiple-family residential, commercial uses, community uses, golf <br /> support facilities, support service facilities, open space and recreational areas, <br /> pedestrian pathways and bikeways, and ancillary related improvements. <br /> E. The maximum number of multiple-family residential timeshare units allowed <br /> shall be 900 units. Any increase in the number of units shall require an <br /> amendment to the Kumu Hou Project District Ordinance. <br /> F. A minimum of 20.8 acres (including 17.8 acres of renaturalized lava) throughout <br /> the Kumu Hou Project District, shall be set aside for open space and recreational <br /> uses, which includes a minimum of three (3) acres of improved areas including <br /> parks, trails, and the like, as represented in the Applicant's conceptual plans. As <br /> represented by the Applicant, construction of the proposed gateway parks and <br /> public access pathways shall be completed no later than issuance of the first <br /> occupancy permit for the first multiple-family residential structure. <br /> a <br /> -22- <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.