Laserfiche WebLink
proposed use in this case. So, when we're looking at this proposed use it's using this existing <br /> structure 1,100 square feet. It's a relatively small business. There will be 4 proposed parking <br /> spaces. The sequence of events will go if you agree with the recommendation, and forward that <br /> to the County Council and then we get through the entitlement process and get the Change of <br /> Zone. Then we will prepare more detailed site plans for the Plan Approval and then the Palmers <br /> will prepare more detailed building plans for the Change of Use. So, there's several steps and <br /> checks and balances and reviews in this process, this is the very first step. <br /> So, we're looking at evaluating these conditions very carefully because what happens a lot of <br /> times in rezone requests or Special Management Area permits. These permits that come before <br /> you to be evaluated is conditions are proposed, and maybe they're not evaluated super carefully. <br /> They're incorporated into the ordinance or the permit whichever the case may be, and then the <br /> applicants or the owners get into those later phases, and they find that the conditions are written <br /> make the development and infeasible and practical and possible cost prohibitive. So, that's what <br /> we're trying to head off here in this process. Looking forward to those engineering drawings and <br /> what the actual cost would be to put in the,thanks Ms. Andrews. This will work. <br /> So, you can see, we estimate that requiring curb, gutter, and sidewalks and actually putting those <br /> in on this short stretch of road frontage on the Laukahi Road [Place] would basically double the <br /> cost of this project and may make it infeasible. We can't have a perfect idea of what those costs <br /> are going to be without the actual engineering drawings and those are costly themselves to <br /> produce. So, if you look at the sites to the east, so to the right are zoned residential but they're <br /> used as schools, as churches, the HMSA property to the south, this area is all pretty much built <br /> up. We're not anticipating a whole lot of infill or additional uses, additional rezoning in this area <br /> in the foreseeable future. So, this is basically a dead-end street that ends just to the east of that <br /> slightly wooded area, the backside of the residential lot to the east there. <br /> So, the improvements would represent about 75 feet on that eastern side of their frontage and <br /> about 35 feet so two very short sections of sidewalk which would have little benefit to the public. <br /> We've shown and we've seen in the conditions on the street there's grass there currently and <br /> there's no, and the grass is in great shape. There's not a lot of traffic on that north side of <br /> Laukahi and further putting those pedestrian facilities on the north side of the street and then <br /> having them directly to the driveway entrance to this heavily traffic convenience store and gas <br /> station right there on the corner seems to be a little bit questionable in terms of safety. So, we <br /> would suggest that again to defer the curb, gutter, and sidewalk improvements until such a time <br /> that any uses are proposed that would expand or alter the existing structure beyond its existing <br /> footprint or a new structure. So, that's the language that we provided in our most recent <br /> feedback on this project. So, happy to go over this in depth and we really appreciate your <br /> favorable consideration. We'll do our best to answer all your questions. Thank you much. <br /> AU: Commissioners do you have any questions for the applicants? <br /> LIN: Chair Au? <br /> AU: Commissioner Lin go ahead. <br /> 5 <br /> EXHIBIT B (DRAFT) <br />