My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 127 Draft 04 2020-2022
ClerkCouncil
>
Council Records
>
Bills
>
2020-2022
>
BIL 127 Draft 04 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 10:05:00 AM
Creation date
6/7/2022 4:28:17 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2020-2022
Bill/Resolution
127
Draft
04
Introducer
Matt Kaneali'i-Kleinfelder, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 127, Draft 4, passes second & final reading - 6/2/22
Date To Mayor or Adoption Date
6/9/2022
Reading Number
2
Reading Date
6/2/2022
Ayes
8-David, Inaba, Kaneali'i-Kleinfelder, Kierkiewicz, Kimball, Lee Loy, Richards, Villegas
Noes
0
Absent
1-Chung
Excused
0
Document Relationships
COM 0663.023 2020-2022 - Part 2-CIP Budget Draft 4
(Related)
Path:
\Council Records\Communications\2020-2022
ORD 2022-064 2020-2022
(Related To)
Path:
\Council Records\Ordinances\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• County of Hawai'i <br /> PROJECT DATA/FINANCIAL IMPACT STATEMENT <br /> Fiscal Year 2022-2023 <br /> 1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 12/21/2021 <br /> 3. PROJECT NAME: DEM-Pahala Wastewater System(reappr.) 4.SUBMITTER: E.Takamura <br /> 5. COUNCIL BENEFIT DISTRICT(S): 6 6.TMK/CDP PLANNING AREA: 9-5/Ka'u <br /> 7. LOCATION(COUNCIL DISTRICT): 6 8.TOTAL COUNTY FUNDS NEEDED THIS FY: <br /> 9. PROJECT ELIGIBILITY,V all 0 Land acquisition 0 Infrastructure improvement 0 New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,lone: <br /> that apply: 0 Nonrecurring rehabilitation 0 Planning,feasibility,eng.,or design study 0 Information/communication tech. 0 High ❑ Med. 0 Low <br /> 11. PROJECT/PROGRAM New treatment and disposal facility to replace C.Brewer plantation LCC sewer system including closure of two(2)Large Capacity Cesspools which are currently owned by the County of <br /> DESCRIPTION: Hawaii. <br /> • <br /> 12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: D. Repair/maintenance/replacement of Necessary repair/maintenance/replacement. <br /> A. Addresses public health/safety,/if Yes: El Community concerns exists around conditions. facility/infrastructure/building,/if Yes: 0 <br /> B. Service improvements,Vali that apply: ❑Access to 0 Quality of 0 Quantity of E. New facility/infr./bldg.,/if Yes: 0 Needed to continue current level of services. <br /> C. Enhances environment and/or quality of life, 0 Preserves/Protects Env. ❑Enhances Education and Arts F. Operational efficiency and leveraging Results in net increase in operating cost. <br /> Vali that apply: ❑Enhances/Protects Culture 0 Promotes Economic Vitality opportunities: N/A <br /> Additional info: <br /> 13. LONG RANGE PLANS/ 0 Dept.Priority Details: Compliance with EPA's LCC AOC ❑Comm.Value Details: <br /> COMMUNITY VALUES,Vali 0 General Plan Details: <br /> ❑Admin Priority Details: <br /> that apply and provide details: ❑CDP Details: <br /> ❑Multi Hazard Details: <br /> 0 Other Plans Details: Mitigation Plan <br /> Additional info: <br /> 14.CTY.MATCHING FUNDS REQ'D?✓if Yes: 0 DESCRIBE: Federal EPA grant requires a 45%match <br /> 15.LEGAL MANDATE?✓if Yes❑ DESCRIBE:Allows compliance with EPA mandate for closure of their Large Capacity Cesspools per AOC SDWA-UIC-AOC-2017-0002 <br /> 16.SUSTAINABILITY FOCUS,Vail that apply: ❑Manages growth ❑Enhances education,culture,arts 0 Preserves/protects our natural/cultural env. <br /> Provide additional information as appropriate: El Strengthens and sustains our community 0 Promotes health and safety 0 Fosters inter-departmental collaboration <br /> Additional info: <br /> 17.PROJECT READINESS,ball ['Project currently underway 0 Previously Appropriated ❑Staff available to manage project 0 External funds/resources ready to proceed <br /> that apply: ['Identified operating budget needs 0 Can realistically encumber funds List phases already completed: Planning and Partial Design <br /> Additional info: <br /> 18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 22-23 Beyond 6 <br /> (not lapsed) Request FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 Years TOTAL: <br /> Planning <br /> Land Acquisition 285 _ $285 <br /> Design/Survey 6,524 $6,524 <br /> Construction 1,842 22,000 $23,842 <br /> TOTAL: $8,651 $22,000 I I $30,651 <br /> 19. 0&M COSTS (x$1000): <br /> 20. FUNDING SOURCE(x$1000): I I I <br /> Cty G.O.Bond 2,620 _ $2,620 <br /> State Revolving Fund _ _ 4,189 22,000 _ $26,189 <br /> State CIP <br /> Federal 1,842 $1,842 <br /> Private(Grants) <br /> CBA(Fair Share,Park Dedication,etc) _ <br /> Other Cty Fund-(describe) <br /> TOTAL: $8,651 $22,000 I $30,651 <br />
The URL can be used to link to this page
Your browser does not support the video tag.