My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 127 Draft 04 2020-2022
ClerkCouncil
>
Council Records
>
Bills
>
2020-2022
>
BIL 127 Draft 04 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 10:05:00 AM
Creation date
6/7/2022 4:28:17 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2020-2022
Bill/Resolution
127
Draft
04
Introducer
Matt Kaneali'i-Kleinfelder, Council Member
Referred To
COUNCIL
Action 1
Council: Bill 127, Draft 4, passes second & final reading - 6/2/22
Date To Mayor or Adoption Date
6/9/2022
Reading Number
2
Reading Date
6/2/2022
Ayes
8-David, Inaba, Kaneali'i-Kleinfelder, Kierkiewicz, Kimball, Lee Loy, Richards, Villegas
Noes
0
Absent
1-Chung
Excused
0
Document Relationships
COM 0663.023 2020-2022 - Part 2-CIP Budget Draft 4
(Related)
Path:
\Council Records\Communications\2020-2022
ORD 2022-064 2020-2022
(Related To)
Path:
\Council Records\Ordinances\2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Hawai'i <br /> PROJECT DATA/FINANCIAL IMPACT STATEMENT <br /> Fiscal Year 2022-2023 <br /> 1. DEPARTMENT AND DIVISION: Department of Environmental Management-Wastewater Division 2.DATE: 3/31/2022 <br /> 3. PROJECT NAME: DEM-Wailuku Force Main and Gravity Sewer Replacement 4.SUBMITTER: D.Beck <br /> 5. COUNCIL BENEFIT DISTRICT(S): 1,2,3 6.TMK/CDP PLANNING AREA: 3-2-3/Hilo <br /> 7. LOCATION(COUNCIL DISTRICT): 3 8.TOTAL COUNTY FUNDS NEEDED THIS FY: $4,400,000 <br /> 9. PROJECT ELIGIBILITY,✓all ❑ Land acquisition 0 Infrastructure improvement ❑ New bldg.,structure,or addition 10. PROJECT URGENCY/NEED,lone: <br /> that apply: LI Nonrecurring rehabilitation ❑Planning,feasibility,eng.,or design study LI Information/communication tech. ❑I High ❑Med. 0 Low <br /> 11. PROJECT/PROGRAM Age and condition of assets necessitates replacement:Wailuku force main originally constructed in 1963. Gravity sewer line originally constructed in 1968 and attached to Wailuku Bridge <br /> DESCRIPTION: crossing Wailuku River. <br /> 12. PROJECT JUSTIFICATION&OUTCOME(S),select and/or answer all that apply: D. Repair/maintenance/replacement of Necessary repair/maintenance/replacement. <br /> A. Addresses public health/safety,✓if Yes: 2 Eliminates a documented hazard. facility/infrastructure/building,✓if Yes: ) <br /> B. Service improvements,"all that apply: LI Access to LI Quality of ❑Quantity of E. New facility/infr./bldg.,✓if Yes: ( •Needed to continue current level of services. <br /> C. Enhances environment and/or quality of life, Preserves/Protects Env. ❑Enhances Education and Arts F. Operational efficiency and leveraging Results in net decrease in operating cost and maintains services. <br /> "all that apply: ❑Enhances/Protects Culture ❑I Promotes Economic Vitality opportunities: Has no reduction of construction costs. <br /> Additional info: Anticipate enforcement action by EPA/DOH to replace close to 60 year-old force main&54 year-old gravity sewer alongside Wailuku Bridge. <br /> 13. LONG RANGE PLANS/ ❑✓ Dept.Priority Details:The Wailuku PS conveys wastewater from Hilo to the HWWTP Q Comm.Value Details:Gravity sewer conveys sewage to the Wailuku SPS which pumps sewage through the FM. <br /> COMMUNITY VALUES,Vali LI General Plan Details: <br /> ❑Admin Priority Details: <br /> that apply and provide details: ❑CDP Details: <br /> ❑Multi Hazard Details: <br /> ❑Other Plans Details: Mitigation Plan <br /> cn <br /> Additional info:Failure of Wailuku Gravity Sewer or Force Main could potentially result in a spill to State Waters. <br /> 14.CTY.MATCHING FUNDS REQ'D?✓if Yes: LI DESCRIBE: <br /> 15.LEGAL MANDATE?"if Yes❑ IDESCRIBE: <br /> 16.SUSTAINABILITY FOCUS,/all that apply: ❑ Manages growth 0 Enhances education,culture,arts j( Preserves/protects our natural/cultural env. <br /> Provide additional information as appropriate: 0 Strengthens and sustains our community 0 Promotes health and safety ❑Fosters inter-departmental collaboration <br /> Additional info: <br /> 17.PROJECT READINESS,"all ❑Project currently underway 0 Previously Appropriated ❑' Staff available to manage project 0 External funds/resources ready to proceed <br /> that apply: 0 Identified operating budget needs 0 Can realistically encumber funds List phases already completed: Planning and Design(in progress) <br /> Additional info: <br /> 18. EXPENDITURE PHASING(X$1000): Prior Funds Allotted This FY 22-23 Beyond 6 <br /> (not lapsed) Request FY 23-24 FY 24-25 FY 25-26 FY 26-27 FY 27-28 Years TOTAL: <br /> Planning <br /> Land Acquisition <br /> Design/Survey 400 $400 <br /> Construction 4,000 $4,000 <br /> TOTAL: $4,400 $4,400 <br /> 19. 0&M COSTS (x$1000): <br /> 20. FUNDING SOURCE(x$1000): <br /> Cty G.O.Bond 4,400 $4,400 <br /> State Revolving Fund <br /> State CIP <br /> Federal <br /> Private(Grants) <br /> CBA(Fair Share,Park Dedication,etc) <br /> Other Cty Fund-(describe) <br /> TOTAL: $4,400 $4,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.