Laserfiche WebLink
E. Prior to receipt of a Certificate of Occupancy, the applicant shall provide a fire <br /> hydrant within 150 feet of the property, and either upgrade the existing 4-inch <br /> waterline to a 12-inch waterline for a distance of approximately 800 feet or <br /> provide a private water system capable of providing a minimum flow of 2,000- <br /> gallons per minute for a 2-hour duration and a pipeline velocity of less than 10 <br /> feet per second, or provide another method of fire protection as approved by the <br /> Fire Department. <br /> F. Should a larger water meter be required, a reduced pressure type backflow <br /> prevention assembly must be installed within five (5) feet of the meter on private <br /> property and must be inspected by the Department before water service can be <br /> activated. <br /> G. Subject to other agencies' requirements to construct improvements within the <br /> road right-of-way fronting the property affected by the proposed development, the <br /> applicant shall be responsible for the relocation and adjustment of the <br /> Department's affected water system facilities, should they be necessary, which <br /> may include conveying the water system improvements and necessary easements <br /> to the Water Board. <br /> H. All driveway connections to [Slaughter House] Shipman Road(formerly <br /> Slaughter House Road), shall conform to Chapter 22, County Streets, of the <br /> Hawai`i County Code. <br /> The applicant shall provide a 10-foot wide road and utility easement along the <br /> subject property frontage of[Slaughter House] Shipman Road (formerly <br /> Slaughter House Road). The easement shall provide reciprocal rights for access to <br /> all lots along [Slaughter House] Shipman Road (formerly Slaughter House Road). <br /> Prior to receipt of a Certificate of Occupancy[;] for any new structures (excluding <br /> structures not requiring a certificate of occupancy such as storage and utility sheds <br /> -3- <br />