Laserfiche WebLink
cross section for business & industrial standards, which is a 60-foot wide right of way <br /> with 12-foot wide paved travel lanes, 8-foot wide paved shoulders and 10-foot wide <br /> paved drainage swales. <br /> 23. Water: There is an existing 5/8-inch meter currently serving the subject parcel, which is <br /> limited to an average usage of 400-gallons per day or one (1)unit of water. Potable water <br /> from the County can only be used for non-production purposes, such as handwashing, <br /> restroom and for employees to drink. DWS has indicated that the onsite well and County <br /> water system cannot be interconnected in any way. Should the applicant develop a <br /> different industrial use on the property than the proposed microbrewery, they will be <br /> required to submit estimated water usage calculations and DWS will determine if <br /> additional or larger water meter(s) will be required for the industrial land use. The <br /> County water system in the area includes a 16-inch waterline in the Keaau Bypass right- <br /> of-way, which branches off to a 6-inch waterline on Shipman Road but only to the area <br /> where the road turns left. At that point it drops down to a 4-inch waterline fronting the <br /> subject property. DWS system standards require that a minimum flow of 2,000-gallons <br /> per minute for a 2-hour duration and a pipeline velocity of less than 10-feet per second be <br /> available at the site for fire protection for industrial land uses. The existing 4-inch <br /> waterline fronting the property is inadequate for fire protection and the nearest fire <br /> hydrant is more than the required 150 feet from the property. <br /> 24. Wastewater: There is no municipal wastewater system in the area. According to the <br /> applicant, an enhanced septic system meeting with the requirements of the Department of <br /> Health will be required. <br /> 25. Solid Waste: The applicant indicated that the solid waste will be handled through <br /> commercial haulers and deposited in the Hilo landfill. <br /> 26. Other Utilities/Services: Electricity, cable and telephone are available to the site. <br /> Police, fire protection and emergency medical services are located in Kea'au, less than <br /> two miles from the property. <br /> AGENCIES' COMMENTS <br /> 27. Department of Public Works Engineering Division: Planning Department Exhibit 4 <br /> —May 25, 2022 Memo <br /> -6- <br />