My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0973.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0973.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2023 1:59:13 PM
Creation date
9/2/2022 11:38:01 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0973
Point
000
Author
Mitchell D. Roth, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2022-10-19 2020-2022
(Related)
Path:
\Council Records\Agendas\2020-2022\Council
AGE COUNCIL 2022-11-02 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE PC 2022/10/05 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
BIL 207 Draft 01 2020-2022
(Related To)
Path:
\Council Records\Bills\2020-2022
REP PC 079 2022/10/05 (2020-2022)
(Related)
Path:
\Council Records\Reports\2020-2022\Planning Committee (PC)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TMC Honoka'a Plantation Cottages <br /> i= ieTraffic Assessment Report May 22, 2020 <br /> For the purpose of this traffic assessment,an annual average growth rate of 1.00 percent <br /> was uniformly applied to the existing(Year 2019)peak hour through traffic on Mamalahoa <br /> Highway and an annual average growth rate of 1.25 percent was applied to the existing <br /> peak hour traffic on Pakalana Street and Lehua Street to estimate the Year 2024 peak hour <br /> traffic demands without the proposed project. <br /> B. Year 2024 AM Peak Hour Traffic Without Project <br /> Pakalana Street and Mauna Loa Street are expected to continue to operate at LOS "C" <br /> and LOS "B" at Mamalahoa Highway, respectively, during the Year 2024 AM peak hour <br /> of traffic without the proposed project.The left-turn movement from eastbound Mamalahoa <br /> Highway onto Pakalana Street is also expected to continue to operate at LOS "A". <br /> • <br /> Lehua Street is expected to operate at LOS "B". The Year 2024 AM peak hour traffic <br /> volumes without the proposed project are depicted on Figure 4. <br /> C. Year 2024 PM Peak Hour Traffic Without Project <br /> During the Year 2024 PM peak hour of traffic without the proposed project, the <br /> intersections in the study area are expected to continue to operate at the same Levels of <br /> • Service as during the existing PM peak hour of traffic. Figure 5 depicts the Year 2024 PM <br /> peak hour volumes without the proposed project. <br /> IV. Traffic Impact Analysis <br /> A. Trip Generation Characteristics <br /> The trip generation characteristics for the proposed Honoka'a Plantation Cottages were <br /> based upon the ITE trip rates for an 80-unit single-family detached housing project. The <br /> ITE trip generation characteristics for the proposed project are summarized in Table 2. <br /> Table 2. ITE Trip Generation Characteristics <br /> Land Use AM Peak Hour (vph) PM Peak Hour (vph) <br /> (ITE Code) DU <br /> Enter Exit Total Enter Exit Total <br /> Single-Family 80 15 46 61 52 30 82 <br /> Detached Housing (210) <br /> B. Traffic Assignment <br /> The traffic assignments were based upon the existing traffic patterns at the intersection <br /> of Mamalahoa Highway and Pakalana Street. The AM and PM peak hour assignments of <br /> site-generated traffic are depicted on Figures 6 and 7, respectively. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.