My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0973.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0973.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2023 1:59:13 PM
Creation date
9/2/2022 11:38:01 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0973
Point
000
Author
Mitchell D. Roth, Mayor
Communications - Referred To
PC
Document Relationships
AGE COUNCIL 2022-10-19 2020-2022
(Related)
Path:
\Council Records\Agendas\2020-2022\Council
AGE COUNCIL 2022-11-02 2020-2022
(Related To)
Path:
\Council Records\Agendas\2020-2022\Council
AGE PC 2022/10/05 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Planning Committee (PC)
BIL 207 Draft 01 2020-2022
(Related To)
Path:
\Council Records\Bills\2020-2022
REP PC 079 2022/10/05 (2020-2022)
(Related)
Path:
\Council Records\Reports\2020-2022\Planning Committee (PC)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
)M Honoka'a Plantation Cottages <br /> Traffic Assessment Report May 22, 2020 <br /> C. Year 2024 AM Peak Hour Traffic Analysis With Project <br /> Both Pakalana Street and Mauna Loa Street are expected to operate at LOS "C" at <br /> Mamalahoa Highway, during the Year 2024 AM peak hour of traffic with the proposed <br /> project. The left-turn movement from eastbound Mamalahoa Highway onto Pakalana <br /> Street is expected to continue to operate at LOS "A"with the proposed project. <br /> Lehua Street is expected to operate at LOS "B", during the Year 2024 AM peak hour <br /> of traffic with the proposed project. Figure 8 depicts the Year 2024 AM peak hour traffic <br /> with the proposed project. <br /> D. Year 2024 PM Peak Hour Traffic Analysis With Project <br /> During the Year 2024 PM peak hour of traffic with the proposed project, Pakalana <br /> Street and Mauna Loa Street are expected to operate at LOS "C" at Mamalahoa Highway. <br /> The left-turn movement from eastbound Mamalahoa Highway onto Pakalana Street is <br /> expected to continue to operate at LOS "A" with the proposed project. <br /> Lehua Street is expected to operate at LOS "A", during the Year 2024 PM peak hour <br /> of traffic with the proposed project. Figure 9 depicts the Year 2024 PM peak hour traffic <br /> with the proposed project. <br /> V. Recommendations and Conclusions <br /> A. Recommendations <br /> The following roadway improvements are recommended to mitigate the existing <br /> conditions on Lehua Street: <br /> 1. A"Yield to Oncoming Traffic" sign should be posted at the existing drainage crossing <br /> on westbound Lehua Street. <br /> 2. Appropriate sight distances should be maintained in both directions on Lehua Street at <br /> the existing drainage crossing. <br /> 3. Appropriate sight distances should be maintained in both directions along Lehua Street <br /> between the existing drainage crossing and Honoka'a Park. <br /> 4. Lehua Street should be restriped at Pakalana Street to reduce the skewed angle of the <br /> • intersection. <br /> • <br /> • <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.