My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0988.001 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 0988.001 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 8:25:15 AM
Creation date
10/31/2022 9:00:35 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
0988
Point
001
Author
Tyler J. Benner, County Auditor
Communications - Referred To
FC
Comments
FC: Close file - 11/15/22.
Document Relationships
AGE FC 2022/11/15 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conclusion <br /> The primary function of DWS is to provide safe drinking water service through its 23 individual <br /> water systems distributed throughout the island. The Department of Water Supply continuously <br /> strives to provide dependable, uninterrupted, high quality, potable water at a reasonable cost in <br /> compliance with the Safe Drinking Water Act. <br /> Contingency and continuity plans are similar: they both require specific procedures in instances <br /> where things go wrong to allow for continuing operations. A continuity plan is a broader plan that <br /> includes steps on the prevention and recovery of operations in the event of a disaster. Whereas <br /> a contingency plan is a vital part of the continuity plan that helps organizational leaders prepare <br /> for worst-case scenarios. In other words, contingency plans cover in-the-moment procedures in <br /> an emergency while a continuity plan covers how an organization will get up and running again. <br /> Best practices say that contingency plans should address specific criteria for the initiation and <br /> termination of water shortage stages, procedures for notification and education of the public, and <br /> procedures for monitoring the situation during water shortage stages. <br /> We commend the Department of Water Supply for their efforts to improve contingency plans to <br /> provide water to customers during a disruption of deepwell operations. To further strengthen <br /> internal controls over contingency plans, we've identified some opportunities: <br /> DWS should: <br /> • Review and update written plans accordingly <br /> • Consolidate applicable plans <br /> • Make plans accessible to appropriate DWS staff <br /> • Re-certify Continuity of Operations Plan annually <br /> In closing, to improve government accountability and ensure audit recommendations are <br /> implemented or resolved, we will continuously monitor the status of recommendations using our <br /> remediation tracker. To view the department's status, visit us at: <br /> https://www.hawaiicounty.gov/our-county/legislative/office-of-the-cou nty-auditor. <br /> 13 1 Conclusion <br />
The URL can be used to link to this page
Your browser does not support the video tag.