My WebLink
|
Help
|
About
|
Sign Out
Home
COM 1092.000 2020-2022
ClerkCouncil
>
Council Records
>
Communications
>
2020-2022
>
COM 1092.000 2020-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2022 8:25:32 AM
Creation date
10/31/2022 9:33:58 AM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2020-2022
Communication
1092
Point
000
Author
Jean M. Miscovich, Commission Secretary
Communications - Referred To
FC
Comments
FC: Close file - 11/15/22.
Document Relationships
AGE FC 2022/11/15 (2020-2022)
(Related)
Path:
\Council Records\Agendas\2020-2022\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMITTING / CONSTRUCTION <br /> RECOMMENDATIONS: <br /> 1. Review interpretation/modification of building codes to potentially allow provisional <br /> permitting for pre-approved, licensed A/E, electrical, and plumbing firms and <br /> contractors. <br /> 2. Continue permit reviews without pause or delay while waiting for discrepancies to be <br /> corrected by applicants. <br /> 3. Consider separating out permits into different scopes to expedite approvals. <br /> 4. Update non-residential checklist to reflect the requirements for intake. <br /> 5. Develop permitting fees appropriate to the scale of building or permitting requested. <br /> 6. Consider developing a fee structure for low-income applicants. <br /> 7. Minimize unpermitted structures by reviewing/modifying current policies. <br /> 8. Develop measures for evaluation of the status of the permitting process that are <br /> reviewed weekly to ensure compliance with timelines. <br /> 9. Consider implementing the following alterations to the County's Electronic <br /> Processing and Information Center(EPIC) system: <br /> a. Install EPIC kiosks that are more accessible to the public <br /> b. Develop a queue for submissions <br /> c. Consider the ability for contractors to have oversight of the permit process <br /> d. Develop immediate notification to submitters when an error has been found <br /> e. Develop a submission system for complaints <br /> 10. Review county code of recurring deficiencies to see alterations to the code that should <br /> be made or if better training and review resources should be provided to the public <br /> The Building Division Permitted Interaction Group (PIG) was enacted to determine areas <br /> across departments that could streamline processes and procedures to provide effective and <br /> efficient service. More specifically, the Commissioners in this PIG wanted to determine current <br /> staffing issues, the efficiency of the current evaluation process, and the appropriateness and short <br /> comings of the EPIC system. The Commissioners in this PIG began by sending a letter <br /> (Appendix A)to the Department of Public Works (DPW) requesting feedback on identified <br /> 5 <br /> 2022 Cost of Government Commission—County of Hawai'i -Final Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.