My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0013.007 2022-2024
ClerkCouncil
>
Council Records
>
Communications
>
2022-2024
>
COM 0013.007 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2023 8:59:35 AM
Creation date
3/8/2023 4:00:34 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2022-2024
Communication
0013
Point
007
Author
Deanna S. Sako, Director of Finance
Communications - Referred To
FC
Comments
FC: Close file - 3/21/23.
Document Relationships
AGE FC 2023/03/21 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT OF CHANGE ORDERS AUTHORIZED <br /> FOR THE PERIOD OF: <br /> 2/16/2023-2/28/2023 <br /> Legend: <br /> CO Change Order <br /> SA Supplemental Agreement <br /> P5 Professional Services <br /> C Construction <br /> PTA Price Term Agreement <br /> GS Other Goods&Services <br /> Original Original %of Cumulative %of <br /> Execution Job Contract Project Contract Dept. Contract Contract CO/SA CO/SA Orig CO/SA Orig Contractor Project Project Purpose <br /> Date # # Title Type Amount Date No. Amount Cont Total Cont Manager Status <br /> Budget adjustments to reflect change in scope of work and the removal of <br /> 2/16/2023 NA C.008783 Design-Build for Kukuiola Access Road SA OHCD $214,857.58 9/9/2020 6 $22,693.95 10.56% $6,655,913.76 3097.83%Tinguely Development S Hirota Open work related to the"Village". <br /> Incorporation of Field Orders 1,2,4 to provide:Extension of time from <br /> August 30,2022 through February 3,2023,additional materials,hauling <br /> 2/16/2023 WW-4631 C.009858 Kapehu WwrP Perimeter Security Fence CO . DEM $301,017.10 6/16/2022 1 -$28,397.00 -9.43% -$28,397.00 -9.43%Isemoto Contracting Co.Ltd. M Grant Open and disposal,and reduction of Hydro-seeding and grass maintenance. <br /> Extend by three-month period from February 1,2023 through April 30, <br /> 2/16/2023 IFB#4076 PTA Heavy Equipment for Various Locations Island Wide for DEM,COH SA FIN $0.00 5/3/2021 4 $0.00 0.00% $0.00 0.00%Bacon Universal Company N Charon Open 2023. <br /> Extend by three-month period from February 1,2023 through April 30, <br /> 2/16/2023 IFB#4076 PTA Heavy Equipment for Various Locations Island Wide for DEM,COH SA FIN $0.00 7/20/2021 4 $0.00 0.00% $0.00 0.00%Sanborn General Contracting Inc. N Charon Open 2023. <br /> Fabricate and install metal grates at the junction of roof gutters and <br /> downspouts in order to filter out foreign materails washing off roof which <br /> 2/17/2023 H-4672 C.009847 Ulu Wini Housing Exterior Building Repairs and Maintenance SA DPW $886,186.00 6/13/2022 3 $4,978.32 0.56% $88,893.35 10.03%Isemoto Contracting Co.Ltd. TJ Oesterling Open could obstruct downspouts and outfall lines. <br /> Robert's Tours and Transportation, Extend by optional one-year term from February 24,2023 through <br /> 2/22/2023 RFP#3909 PTA Furnish/Operate Hele-On Fixed Route Transit Service for MTA,COH SA FIN $0.00 2/25/2020 4 $0.00 0.00% $0.00 0.00%Inc. N Charon Open February 23,2024. <br /> 2/22/2023 B-4614 C.010091 Pahala Fire Station Perimeter Fencing CO DPW $267,900.00 7/16/2022 1 $1,710.00 0.64% $1,710.00 0.64%Site Engineering,Inc. 1 Imanaka Open Relocate entry pad pedestal 12 feet away from the gate. <br /> 2/23/2023 T-4650 PTA Traffic Signal Repairs and Installation for the East Side District SA DPW $0.00 2/22/2022 1 $0.00 0.00% $0.00 0.00%T&T Electric,Inc. A Takaba Open Extend for 126 day period from February 25,2023 through June 30,2023. <br /> Septage Hauling and Pumping Services for Various Septic Tanks,Wastewater Facilities,and Extend for optional one-year period from May 1,2023 through April 30, <br /> 2/27/2023 IFB#4211 PTA Collection Systems SA FIN $0.00 5/22/2022 2 $0.00 0.00% $0.00 0.00%Kona Lua N Charon Open 2024. <br /> Extend for optional one-year period from July 1,2023 through June 30, <br /> 2/28/2023 IFB#3834 PTA Furnishing and Delivering LD Streetlights for DPW,COH SA FIN $0.00 7/29/2019 4 $0.00 0.00% $0.00 0.00%Wesco Distributions,Inc. N Charon Open 2024. <br /> Contracts 10 Total Original Contract $1,669,960.68 Total CO/SA 10 <br /> Amountfor Period <br /> Total CO/SA $985.27 <br /> Amount for Period <br />
The URL can be used to link to this page
Your browser does not support the video tag.