Laserfiche WebLink
Iki Place Improvement District <br /> WATER SYSTEM INSTALLATION COST ESTIMATE <br /> TMK 7-3-19:011 & 037 <br /> ITEM QUANTITY UNITS UNIT PRICE AMOUNT <br /> A. CONSTRUCTION COST <br /> Project Mobilization,and Demobilization. $15,000 <br /> Not to exceed$ 15,000 Lump Sum <br /> 8"D.I. Pipe 1,125 I.f. $140 $157,500 <br /> 8"90° C.I. Bend, M.J. 1 ea. $600 $600 <br /> B"x8°Ci.Tee, M.J. 1 ea. $850 $850 <br /> 8"x6"C.I. Tee, M.J. 3 ea. $800 $2,400 <br /> 6"x6"C.I.Tee, M.J. 1 ea. $750 $750 <br /> 8"Gate Valve&Box 1 ea. $2,700 $2,700 <br /> 6"Gate Valve&Box 2 ea. $2,350 $4,700 <br /> 8"Solid Body Sleeve 2 ea. $700 $1,400 <br /> 6"Solid Body Sleeve 2 ea. $600 $1,200 I <br /> Fire Hydrant Type B 2 ea. $9,000 $18,000 <br /> 1"Air Relief Valve Unit&Box 1 ea. $3,000 $3,000 <br /> 1"Type"A"Lateral 2 ea. $4,000 $8,000 <br /> 1.5"Type"C" Lateral 8 ea. $4,500 $36,000 <br /> Cut and Plug Existing Service Laterals 15 ea. $900 $13,500 <br /> Connections to existing waterline 1 ea. $7,000 $7,000 <br /> Chlorination and Testing Lump Sum $15,000 <br /> Pavement Repair: <br /> 2-inch min AC(one-lane)Aniani Street 444 sy $80 $35,520 <br /> 2-inch min AG(12-ft wide road)Iki Place 967 sy $125 $120,875 <br /> CONSTRUCTION COST $443,995 <br /> Contingency(20%) 88,800 <br /> TOTAL CONSTRUCTION COST $532,795 <br /> B. OTHER COSTS <br /> Consultant Fee* 80,000 <br /> Planning/Environmental Report 30,000 <br /> Legal Fees <br /> 45,000 <br /> Miscellaneous Costs* 21,300 <br /> TOTAL OTHER COSTS 1767300 <br /> (TOTAL ESTIMATE IMPROVEMENT DISTRICT COST $709,0951 <br /> • Percentage of total construction cost <br /> EXHIBIT E <br />