My WebLink
|
Help
|
About
|
Sign Out
Home
RES 164 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Resolutions
>
2022-2024
>
RES 164 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 3:39:58 PM
Creation date
5/2/2023 9:55:16 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
164
Draft
01
Introducer
Holeka Goro Inaba, Council Member
Referred To
FC
Action 1
FC-53: Recommended Adoption - 05/16/23
Action 2
Council: Postponed Res. 164-23 to the June 21, 2023, Council Meeting - 06/07/23
Action 3
Council: Adopts Res. 164-23 & FC-53 - 06/21/23
Status
Adopted
Date To Mayor or Adoption Date
6/21/2023
Reading Number
1
Reading Date
6/21/2023
Ayes
7-Evans, Galimba, Inaba, Kagiwada, Kimball, Lee Loy, Villegas
Noes
0
Absent
2-Kaneali'i-Kleinfelder, Kierkiewicz
Excused
0
Document Relationships
AGE COUNCIL 2023-06-07 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE COUNCIL 2023-06-21 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE FC 2023/05/16 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Finance Committee (FC)
COM 0271.000 2022-2024
(Original Version)
Path:
\Council Records\Communications\2022-2024
REP FC 053 2023/05/16 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iki Place Improvement District <br /> WATER SYSTEM INSTALLATION COST ESTIMATE <br /> TMK 7-3-19:011 & 037 <br /> ITEM QUANTITY UNITS UNIT PRICE AMOUNT <br /> A. CONSTRUCTION COST <br /> Project Mobilization,and Demobilization. $15,000 <br /> Not to exceed$ 15,000 Lump Sum <br /> 8"D.I. Pipe 1,125 I.f. $140 $157,500 <br /> 8"90° C.I. Bend, M.J. 1 ea. $600 $600 <br /> B"x8°Ci.Tee, M.J. 1 ea. $850 $850 <br /> 8"x6"C.I. Tee, M.J. 3 ea. $800 $2,400 <br /> 6"x6"C.I.Tee, M.J. 1 ea. $750 $750 <br /> 8"Gate Valve&Box 1 ea. $2,700 $2,700 <br /> 6"Gate Valve&Box 2 ea. $2,350 $4,700 <br /> 8"Solid Body Sleeve 2 ea. $700 $1,400 <br /> 6"Solid Body Sleeve 2 ea. $600 $1,200 I <br /> Fire Hydrant Type B 2 ea. $9,000 $18,000 <br /> 1"Air Relief Valve Unit&Box 1 ea. $3,000 $3,000 <br /> 1"Type"A"Lateral 2 ea. $4,000 $8,000 <br /> 1.5"Type"C" Lateral 8 ea. $4,500 $36,000 <br /> Cut and Plug Existing Service Laterals 15 ea. $900 $13,500 <br /> Connections to existing waterline 1 ea. $7,000 $7,000 <br /> Chlorination and Testing Lump Sum $15,000 <br /> Pavement Repair: <br /> 2-inch min AC(one-lane)Aniani Street 444 sy $80 $35,520 <br /> 2-inch min AG(12-ft wide road)Iki Place 967 sy $125 $120,875 <br /> CONSTRUCTION COST $443,995 <br /> Contingency(20%) 88,800 <br /> TOTAL CONSTRUCTION COST $532,795 <br /> B. OTHER COSTS <br /> Consultant Fee* 80,000 <br /> Planning/Environmental Report 30,000 <br /> Legal Fees <br /> 45,000 <br /> Miscellaneous Costs* 21,300 <br /> TOTAL OTHER COSTS 1767300 <br /> (TOTAL ESTIMATE IMPROVEMENT DISTRICT COST $709,0951 <br /> • Percentage of total construction cost <br /> EXHIBIT E <br />
The URL can be used to link to this page
Your browser does not support the video tag.