My WebLink
|
Help
|
About
|
Sign Out
Home
RES 164 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Resolutions
>
2022-2024
>
RES 164 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 3:39:58 PM
Creation date
5/2/2023 9:55:16 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
164
Draft
01
Introducer
Holeka Goro Inaba, Council Member
Referred To
FC
Action 1
FC-53: Recommended Adoption - 05/16/23
Action 2
Council: Postponed Res. 164-23 to the June 21, 2023, Council Meeting - 06/07/23
Action 3
Council: Adopts Res. 164-23 & FC-53 - 06/21/23
Status
Adopted
Date To Mayor or Adoption Date
6/21/2023
Reading Number
1
Reading Date
6/21/2023
Ayes
7-Evans, Galimba, Inaba, Kagiwada, Kimball, Lee Loy, Villegas
Noes
0
Absent
2-Kaneali'i-Kleinfelder, Kierkiewicz
Excused
0
Document Relationships
AGE COUNCIL 2023-06-07 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE COUNCIL 2023-06-21 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE FC 2023/05/16 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Finance Committee (FC)
COM 0271.000 2022-2024
(Original Version)
Path:
\Council Records\Communications\2022-2024
REP FC 053 2023/05/16 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Finance Committee (FC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> 1. GENERAL 1 <br /> 2. PROJECT PLANNING 1 <br /> a. Location 1 <br /> Figure 2a.1 2 <br /> Figure 2a.2 3 <br /> b. Environmental Resources Present 3 <br /> c. Population Trends 4 <br /> d. Community Engagement 4 <br /> 3. EXISTING FACILITIES 4 <br /> a. Location Map 4 <br /> Figure 3a.1 5 <br /> b. History 6 <br /> c. Condition of Facilities 6 <br /> d. Financial Status of Existing Facilities 6 <br /> e. Water Audits 6 <br /> 4. NEED FOR THE PROJECT 6 <br /> a. Health, Sanitation and Safety 6 <br /> b. Aging Infrastructure 6 <br /> c. System Operation and Maintenance 6 <br /> d. Growth 7 <br /> 5. ALTERNATIVES CONSIDERED 7 <br /> a. Description 7 <br /> b. Design Criteria 8 <br /> c. Map 9 <br /> Figure 5c.1 10 <br /> Figure 5c.2 11 <br /> d. Environmental Impacts 11 <br /> e. Land Requirements 11 <br /> f. Construction Problems (Alternatives 2 & 3) 12 <br /> g. Sustainability Considerations 12 <br /> h. Cost Estimates 13 <br /> 6. SELECTION OF AN ALTERNATIVE 13 <br /> a. Lifecycle Cost Analysis 13 <br /> b. Non-Monetary Factors 13 <br /> 7. PROPOSED PROJECT 14 <br /> a. Preliminary Project Design 14 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.