Laserfiche WebLink
Table of Contents <br /> 1. GENERAL 1 <br /> 2. PROJECT PLANNING 1 <br /> a. Location 1 <br /> Figure 2a.1 2 <br /> Figure 2a.2 3 <br /> b. Environmental Resources Present 3 <br /> c. Population Trends 4 <br /> d. Community Engagement 4 <br /> 3. EXISTING FACILITIES 4 <br /> a. Location Map 4 <br /> Figure 3a.1 5 <br /> b. History 6 <br /> c. Condition of Facilities 6 <br /> d. Financial Status of Existing Facilities 6 <br /> e. Water Audits 6 <br /> 4. NEED FOR THE PROJECT 6 <br /> a. Health, Sanitation and Safety 6 <br /> b. Aging Infrastructure 6 <br /> c. System Operation and Maintenance 6 <br /> d. Growth 7 <br /> 5. ALTERNATIVES CONSIDERED 7 <br /> a. Description 7 <br /> b. Design Criteria 8 <br /> c. Map 9 <br /> Figure 5c.1 10 <br /> Figure 5c.2 11 <br /> d. Environmental Impacts 11 <br /> e. Land Requirements 11 <br /> f. Construction Problems (Alternatives 2 & 3) 12 <br /> g. Sustainability Considerations 12 <br /> h. Cost Estimates 13 <br /> 6. SELECTION OF AN ALTERNATIVE 13 <br /> a. Lifecycle Cost Analysis 13 <br /> b. Non-Monetary Factors 13 <br /> 7. PROPOSED PROJECT 14 <br /> a. Preliminary Project Design 14 <br /> i <br />