My WebLink
|
Help
|
About
|
Sign Out
Home
RES 203 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Resolutions
>
2022-2024
>
RES 203 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 4:38:28 PM
Creation date
7/5/2023 8:27:06 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
203
Draft
01
Introducer
Michelle Galimba, Council Member
Referred To
PCCRRA
Action 1
PCCRRA-1: Recommended adoption - 7/18/23
Action 2
Council: Adopts Res. 203-23 & PCCRRA-1 - 08/02/23
Status
Adopted
Date To Mayor or Adoption Date
8/2/2023
Reading Number
1
Reading Date
8/2/2023
Ayes
8-Evans, Galimba, Kagiwada, Kānealiʻi-Kleinfelder, Kierkiewicz, Kimball, Lee Loy, Villegas
Noes
0
Absent
1-Inaba
Excused
0
Document Relationships
AGE COUNCIL 2023-08-02 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE PCCRRA 2023/07/18 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Policy Committee on Climate Resilience and Regenerative Agriculture (PCCRRA)
COM 0361.000 2022-2024
(Related)
Path:
\Council Records\Communications\2022-2024
REP PCCRRA 001 2023-07-18 (2022-2024)
(Related To)
Path:
\Council Records\Reports\2022-2024\Policy Committee on Climate Resilience and Regenerative Agriculture (PCCRRA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' , Greenhouse Gas Reduction and Climate Adaptation Actions to � "�f�`� <br /> IntegratedBuild Local Resilience to Climate Change *��►�� <br /> Eat <br /> 1A6. Support residents and businesses in producing environmentally friendly on-site energy <br /> and implementing energy efficient cooling technologies <br /> Action County Cost Start 2-5 <br /> Number <2 yrs yrs >5 yrs <br /> Expand outreach for community rebate <br /> 1A6.1 incentives by pursuing more public-private R&D $ 2023 • <br /> partnerships with Hawaii Energy <br /> Advocate to the PUC in support of renewable <br /> 1A6.2 energy sources and social equity in regard to R&D $ 2023 • <br /> rates, grid planning, and energy project siting <br /> Create educational workshops and an online- <br /> 1A6.3 web series with partners to increase awareness R&D $ 2023 • <br /> of and access to rebates, tax credits, and <br /> energy conservation technology. <br /> Release grants to encourage development and <br /> 1A6.4 implementation of new on-site energy R&D $$ 2024 • <br /> construction and energy efficiency measures on <br /> island <br /> 1A6.5 Conduct a study to evaluate the environmental R&D $ 2024 • <br /> impact of hydrogen energy production on-island. <br /> 1A7. Reduce the energy cost of the municipal water supply <br /> ActionI Project Duration <br /> 2-5 <br /> Number, <2 yrs yrs >5 yrs <br /> 1A7.1 Replace old pumps with higher efficiency pumps DWS $$ 2023 • <br /> for energy savings. <br /> — Prioritize based on payback period analysis <br /> 1A7.2 Install new Hydro-turbine at Waimea Water DWS $$ 2024 • <br /> Treatment Plant. <br /> 1A7.3 Pursue additional renewable energy projects. DWS $$ 2025 • <br /> 1A7.4 Install power factor correction equipment at DWS $$ 2024 • <br /> large facilities to increase power factor. <br /> 1A7.5 Conduct energy study to establish baseline and DWS $ 2023 • <br /> detail power and energy savings opportunities. <br /> 1A7.6 Continue to optimize operations to reduce DWS $ 2023 • <br /> power demand and energy use. <br /> Continue to purchase and utilize leak detection <br /> 1A7.7 equipment to reduce water leaks in water DWS $ 2023 • <br /> transmission systems. Reducing water loss will <br /> reduce DWS energy use. <br /> Climate Cascade 1:Greenhouse Gas Emissions 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.