My WebLink
|
Help
|
About
|
Sign Out
Home
RES 203 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Resolutions
>
2022-2024
>
RES 203 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2023 4:38:28 PM
Creation date
7/5/2023 8:27:06 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
203
Draft
01
Introducer
Michelle Galimba, Council Member
Referred To
PCCRRA
Action 1
PCCRRA-1: Recommended adoption - 7/18/23
Action 2
Council: Adopts Res. 203-23 & PCCRRA-1 - 08/02/23
Status
Adopted
Date To Mayor or Adoption Date
8/2/2023
Reading Number
1
Reading Date
8/2/2023
Ayes
8-Evans, Galimba, Kagiwada, Kānealiʻi-Kleinfelder, Kierkiewicz, Kimball, Lee Loy, Villegas
Noes
0
Absent
1-Inaba
Excused
0
Document Relationships
AGE COUNCIL 2023-08-02 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE PCCRRA 2023/07/18 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Policy Committee on Climate Resilience and Regenerative Agriculture (PCCRRA)
COM 0361.000 2022-2024
(Related)
Path:
\Council Records\Communications\2022-2024
REP PCCRRA 001 2023-07-18 (2022-2024)
(Related To)
Path:
\Council Records\Reports\2022-2024\Policy Committee on Climate Resilience and Regenerative Agriculture (PCCRRA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ab <br /> Greenhouse Gas Reduction and Climate Adaptation Actions to <br /> ' <br /> : ' , Build Local Resilience to Climate Change *���►�� <br /> Actionect Duration <br /> 2-5 <br /> Numberj <2 yrs yrs >5 yrs <br /> Create transit hubs and bus stops with <br /> 1131.4 amenities that provide rider comfort and safety MTA $$$ <br /> and that help support community and village <br /> gathering <br /> - Plan, design, and build the Kailua-Kona hub. Consider options to 2023 • <br /> provide light service from Kailua-Kona side. <br /> - Design and develop a Puna hub and complete roadway improvements 2023 • <br /> to allow for Intra-Puna service. <br /> 1131.5 Phase implementation in a fiscally sustainable MTA $ <br /> manner <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - <br /> - Test hydrogen and EV fueled buses on the island to demonstrate how 2023 • <br /> well they work on the island's various climate and terrains. <br /> -Add staffing to include an Assistant Mass Transit Administrator, <br /> Inventory Clerk, and a second shift of four mechanics and working 2023 • <br /> supervisor. <br /> 1132. Transition the County fleet to zero emissions <br /> Action2-5 <br /> NumberIM <2 yrs yrs >5 yrs <br /> 1 B2.1 Create a shared-use mobility program among R&D, $ 2024 • <br /> County depts. that use vehicles intermittently DPW, DF <br /> Develop an online platform to consolidate <br /> 1132 2 County vehicle fuel use, vehicle miles traveled, R&D, $ 2025 • <br /> elevation profile of vehicle routes, and vehicle DPW <br /> maintenance data <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - <br /> - Integrate platform with energy management system identified in 1A1.6 <br /> Conduct a study to identify high-priority vehicles <br /> 1 B2.3 for fleet transformation, including vehicles that R&D $$$ 2025 • <br /> need to be replaced and highest-emitting <br /> vehicles <br /> 1 B2.4 Publish an internal annual report and external R&D $ 2023 • <br /> annual summary on fleet use and fleet transition <br /> 1 B2.5 Create a fleet transformation plan for each dept. All,DR&D, $$ 2025 • <br /> - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> - Conduct an alternative fuel vehicle cost-benefit analysis for new <br /> vehicle purchases. The analysis should include IRA tax credits, third <br /> party financing, rebates, and methane-conversion. <br /> Climate Cascade 1:Greenhouse Gas Emissions 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.