Laserfiche WebLink
(b) The director shall determine whether the subject road proposed for consideration satisfies <br />the eligibility criteria set out in section 14-26-4. The director shall notify the requester of <br />the director's determination within six months of the date the written request is received by <br />the department. <br />(c) The director shall request comments from the civil defense agency, Hawaii fire <br />department, mass transit agency, and the planning department, regarding whether the <br />subject roads found to satisfy section 14-26-4, meet any or all of the following criteria: <br />(1) The roads were created or platted before December 21, 1966; <br />(2) The roads are necessary to maintain emergency and mass transportation access; <br />(3) The roads can be utilized to develop emergency or alternate routes and thereby <br />promote community safety and the public interest; or <br />(4) The roads can be integrated into public transportation routes for mass transit, multi- <br />modal transportation systems, or department of education bus routes. <br />These agencies and departments shall respond to the director's request for comment within <br />thirty calendar days from the date the request for comment is received. If any agency or <br />department does not respond within this time, the director may proceed without their input. <br />(d) The director shall identify subject roads that have satisfied section 14-26-4 criteria and <br />have been identified by the civil defense agency, Hawaii fire department, mass transit <br />agency, or the planning department, as satisfying any or all of the criteria in subsection (c). <br />Higher priority shall be afforded to subject roads that meet two or more criteria listed in <br />subsection (c). <br />(e) With respect to subject roads deemed by the director to satisfy the criteria in subsection (d), <br />the director shall assess whether the requests are feasible after consideration of: <br />(1) The area of the requested improvements, gradings, repairs or construction work; <br />(2) The designs and the types and amounts of materials appropriate for the <br />improvements, gradings, repairs, or construction work, pursuant to section 14-26-5; <br />and <br />(3) The estimated cost and nature of resources necessary to complete the work for each <br />request. <br />(f) The director after consideration of the criteria set out in section 14-26-6(g) and <br />appropriation and resource limitations, shall identify feasible requests, if sufficient <br />appropriations and necessary resources can be secured. <br />5 <br />