My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 085 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Bills
>
2022-2024
>
BIL 085 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 10:51:01 AM
Creation date
10/5/2023 2:11:25 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
085
Draft
01
Introducer
Mitchell D. Roth, Mayor
Referred To
LAAC
Action 1
LAAC-37: Amended to Draft 2 - 10/17/23
Document Relationships
AGE LAAC 2023/10/17 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
COM 0518.000 2022-2024
(Related)
Path:
\Council Records\Communications\2022-2024
REP LAAC 037 2023/10/17 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Prior to issuance of Final Subdivision Approval, the Applicant shall remit a water <br />commitment deposit to the Department of Water Supply (DWS) in accordance <br />with Rule 5 of DWS Rules and Regulations. The Applicant is responsible for <br />maintaining valid water commitments to support the proposed development until <br />such time that required water facilities charges are paid in full. <br />D. Prior to issuance of Final Subdivision Approval, the -Applicant shall construct <br />necessary water improvements meeting with the approval of the Department of <br />Water Supply. <br />E. All earthwork activities including grading, grubbing, and stockpiling shall <br />conform .to Chapter 10, Erosion and Sedimentation Control of the Hawaii County <br />Code. <br />F. All driveway connections and construction within Makalika Street shall conform <br />to Chapter 22, County Streets, of the Hawai` i County Code. <br />G. All development -generated runoff shall be disposed of on-site.and not directed <br />toward any adjacent properties. A drainage study shall be prepared by a licensed <br />civil engineer and submitted to. the Department of Public Works (DPW) prior to <br />the issuance of Final Subdivision Approval. Any recommended drainage <br />improvements, if required, shall be constructed meeting with the approval of <br />DPW prior to construction of any structures on the subject property. <br />H. The method of sewage disposal shall meet with the requirements of the State <br />Department of Health. <br />In the event that surface or subsurface historic resources, including human <br />skeletal remains, structural remains (e.g. rock walls, terraces, platforms, etc.), <br />cultural deposits, marine shell concentrations, sand deposits, or sink holes are <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.