Laserfiche WebLink
consists of modifications to the existing influent piping, septage receiving area, <br /> and headworks facilities. <br /> b. The COH is coordinating with the DOH on a plan to evaluate the WWTP's <br /> discharge of treated wastewater,which is expected to be included in a DOH <br /> Administrative Order to the COH. <br /> 5. Kealakehe SPS Force Main: By July 1,2025,the COH shall complete design of a new <br /> (second)force main. <br /> 6. Hale Halawai SPS Force Main: By January 1, 2025, the COH shall issue an invitation for bid <br /> for the construction proposal for the project. By July 1,2025,the COH shall begin <br /> construction on the project, except that after having identified a construction contractor <br /> (but prior to July 1, 2025 the COH may submit a construction schedule to EPA and DOH <br /> for approval of a different construction start date. By June 30, 2027,the COH shall <br /> complete construction of a new force main. <br /> 7. Pua SPS Force Main: By December 28, 2030, the COH shall issue an invitation for bid for <br /> the construction proposal for the project. By July 1, 2030,the COH shall begin <br /> construction on the project, except that after having identified a construction contractor <br /> (but prior to July 1, 2030), the COH may submit a construction schedule to EPA and DOH <br /> for approval of a different construction start date. By June 30, 2035,the COH shall <br /> complete rehabilitation of the existing force main. <br /> II. PLANNING AND REPORTING <br /> 8. Capital Improvement Program (CIP):The COH shall conduct a comprehensive condition <br /> assessment to identify wastewater infrastructure in critical need of repair:The CIP <br /> process shall include: <br /> a. CIP Criteria:The COH shall develop and propose objective scoring criteria for the <br /> condition of wastewater infrastructure and appurtenances. The scoring criteria <br /> shall be used to prioritize and rank necessary repair, rehabilitation, and <br /> replacement projects as well as new capital improvement projects.The scoring <br /> criteria must address condition, criticality, and lifespan based on records review, <br /> direct assessment, or other appropriate technical methods used to evaluate <br /> wastewater infrastructure. <br /> b. Preliminary Condition Assessment:The COH shall complete a preliminary <br /> condition assessment to identify any components of wastewater infrastructure in <br /> critical need of repair or recommended for system sustainability and efficiency. <br /> The assessment shall include the following and shall utilize the objective scoring <br /> criteria developed above: (1) Evaluation of potential data gaps or further <br /> assessment needs to fully identify projects for CIP improvements; (2) Review <br /> In re County of Hawai'i, Docket No. CWA-309(a)-24-003:Appendix 1 Page 3 of 9 <br />