My WebLink
|
Help
|
About
|
Sign Out
Home
RES 441 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Resolutions
>
2022-2024
>
RES 441 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2024 2:14:22 PM
Creation date
2/9/2024 8:42:19 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
441
Draft
01
Introducer
Cindy Evans, Council Member
Referred To
GOEAC
Action 1
Council: Res. 441-24 amended to Draft 2 - 03/06/24
Document Relationships
AGE COUNCIL 2024-03-06 2022-2024
(Related To)
Path:
\Council Records\Agendas\2022-2024\Council
AGE GOEAC 2024/02/20 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Governmental Operations and External Affairs Committee (GOEAC)
COM 0732.000 2022-2024
(Related)
Path:
\Council Records\Communications\2022-2024
REP GOEAC 111 2024/02/20 (2022-2024)
(Related)
Path:
\Council Records\Reports\2022-2024\Governmental Operations and External Affairs Committee (GOEAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. At Hilo WWTP, one of the two pre-aeration tanks is severely corroded and has been <br /> out of service since at least 2016.The second grit screening tank is operable but <br /> exhibits corrosion. <br /> c. At Hilo WWTP, multiple gate valves at the headworks are severely corroded and <br /> inoperable. <br /> d. At Hilo WWTP,the rotating distributor arms at the two biotowers were significantly <br /> corroded with blocked outlets and leaks that were observed during the 2019 <br /> inspection. Respondent did not correct this problem until November 2021, when <br /> Respondent replaced the distributor arms. <br /> e. At Hilo WWTP,two of the four recirculating pumps at the biotowers were inoperable <br /> and were replaced with temporary trailer pumps from approximately 2015 to 2021. <br /> Respondent did not correct this problem until 2021, when Respondent replaced all <br /> biotower pumps. <br /> f. At Hilo WWTP,the isolation valve at the biotowers waste activated sludge (WAS) <br /> pumps is no longer operational, therefore the recirculation rate of waste activated <br /> sludge is unknown and cannot be controlled. <br /> g. At Hilo WWTP, sludge clumping was observed floating in the clarifiers during multiple <br /> inspections from approximately 2013 to 2021, indicating improper operation of the <br /> clarifiers. <br /> h. At Hilo WWTP,the sludge digesters are severely corroded and the gate valve is <br /> inoperable.The inoperable gate valve prevents isolation of the two digesters, and <br /> therefore the digesters cannot be cleaned and maintained. <br /> i. At Hilo WWTP,the floating roof of one of the two sludge digester tanks became stuck <br /> when an overtopping of the sludge occurred, preventing the roof from operating <br /> properly and preventing maintenance of the digester. <br /> j. At Hilo WWTP,the roofs of both digester tanks are significantly corroded,which <br /> prevents maintenance of the tanks due to unsafe conditions. <br /> k. At Hilo WWTP, the boiler for heating the sludge digester tanks has been inoperable <br /> since at least 2016. <br /> I. At Papa'ikou WWTP, the influent grinder screen has been inoperable since at least <br /> 2016, causing Respondent to rely on a secondary bar screen, allowing small materials <br /> such as sanitary wipes and small plastics to pass through the bar screen and cause <br /> maintenance problems. <br /> In re County of Hawai'i, Docket No. CWA-309(a)-24-003 Page 6 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.