My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 169 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Bills
>
2022-2024
>
BIL 169 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 4:09:39 PM
Creation date
5/22/2024 2:27:28 PM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
169
Draft
01
Introducer
Holeka Goro Inaba, Council Member
Referred To
LAAC
Action 1
LAAC: Amended to Draft 2 - 6/4/2024
Document Relationships
AGE LAAC 2024/06/04 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
COM 0896.000 2022-2024
(Related)
Path:
\Council Records\Communications\2022-2024
REP LAAC 064 2024/06/04 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. A National Pollutant Discharge Elimination System (NPDES) permit and an <br /> Underground Injection Control (UIC)permit, if required, shall be secured from the <br /> State Department of Health before the commencement of construction activities. <br /> J. All development generated runoff shall be disposed of on site and shall not be directed <br /> toward any adjacent properties. Prior to receipt of Final Plan Approval,that applicant <br /> shall submit a drainage master plan to the Department of Public Works for review and <br /> approval. The plan shall include, as a minimum, hydrological and hydraulic calculations <br /> for all components of the drainage system, a construction timetable for all elements of the <br /> system, and an analysis of downstream impacts. Further,mitigating measures as <br /> approved by the Department of Public Works shall be taken to eliminate any downstream <br /> impacts. Any recommended drainage improvements shall be constructed meeting with <br /> the approval of the Department of Public Works prior to issuance of a Certificate of <br /> Occupancy for the first phase. <br /> K. The Applicant shall comply with Chapter 27, Flood Control, of the Hawai`i County <br /> Code. <br /> L. All earthwork and grading activity shall conform to Chapter 10, Erosion and <br /> Sedimentation Control of the Hawai`i County Code. <br /> M. Access to the Queen Ka`ahumanu Highway (Route 11) shall be limited to a single <br /> access point consisting of a full movement channelized intersection, the location and <br /> construction of which shall meet with the approval of the State Department of <br /> Transportation prior to the issuance of Certificate of Occupancy for the first phase. <br /> Furthermore,the applicant shall coordinate with the State Department of <br /> Transportation and provide any mitigation measures that may be required, including <br /> any pro-rata contributions, related to the state highway improvements directly related <br /> -8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.