Laserfiche WebLink
E. The Applicant is required to submit water system construction plans prepared by a <br />professional engineer, registered in the State of Hawaii, for Department of Water <br />Supply (DWS) review and approval. Furthermore, the Applicant is required to <br />construct.app licable waters steal improvements. desi ned to deliver water at <br />adequate pressure and volume under peak -flow and fire -flow conditions in <br />accordance with the Water System Standards and the Rules and Regulations of the <br />DWS. <br />F. The Applicant shall implement any im rovemcnts required by the Fire Department <br />and/or Department of Water Supply to ensure that fire protection requirements can be <br />met for RM zoning, <br />G. Construction of all phases of the proposed development, as substantially represented by <br />the Applicant, shall be completed within ten (1Eyears from the effective date of this <br />ordinance. Prior to commencing construction of each phase, the Applicant shall secure <br />Final Plan Approval for the proposed development from the Planning Director in <br />accordance with Section 25-2-70 Chapter 25 (Zoning Code), Hawaii County Code. <br />Plans shall identify.all ro osed structures fire protection measures,..] and.scain <br />si na epaved driveway access and paved parking stalls outdoor li htin if an and <br />other improvements associated with the proposed development. Landscaping shall be <br />indicated on thelans for the purpose of mitigating any adverse noise or visual irn acts to <br />adjacent ro erties in accordance with the requirements of Planning Department's Rule <br />No. 17 (Landscaping Requirements). The Applicant shall comply with landscaping <br />req_uirennents for RM zoning. <br />H. Sewer lines shall be installed within the development to connect with the Count <br />sewer system, meeting with the approval of the Department of Environmental <br />Management and prior to the issuance of a Certificate of Occupancy for each phase. <br />IVA <br />