My WebLink
|
Help
|
About
|
Sign Out
Home
RES 704 Draft 01 2022-2024
ClerkCouncil
>
Council Records
>
Resolutions
>
2022-2024
>
RES 704 Draft 01 2022-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 10:43:36 AM
Creation date
11/6/2024 9:33:11 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
RES
Bill/Resolution - Council Term
2022-2024
Bill/Resolution
704
Draft
01
Introducer
Holeka Goro Inaba, Council Member
Referred To
LAAC
Action 1
LAAC-75: Recommended adoption - 11/19/2024
Action 2
Council: Adopts Res. 704-24 & LAAC-75 - 12/18/24
Status
Adopted
Date To Mayor or Adoption Date
12/18/2024
Reading Number
1
Reading Date
12/18/2024
Ayes
8-Galimba, Hustace, Inaba, Kagiwada, Kaneali'i-Kleinfelder, Kimball, Onishi, and Villegas
Noes
0
Absent
1-Kierkiewicz
Excused
0
Document Relationships
AGE COUNCIL 2024-12-18 2024-2026
(Related To)
Path:
\Council Records\Agendas\2024-2026\Council
AGE LAAC 2024/11/19 (2022-2024)
(Related)
Path:
\Council Records\Agendas\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
COM 1146.000 2022-2024
(Related)
Path:
\Council Records\Communications\2022-2024
REP LAAC 075 2024/11/19 2022-2024
(Related)
Path:
\Council Records\Reports\2022-2024\Legislative Approvals and Acquisitions Committee (LAAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State oflla*ai'iosadditional insureds heissued. The County shall provide its consent tothe <br />form ofthe Construction Contract prior huOLA`nexecution thereof. <br />4. Approvals by the County. County approval ofthe Sewer Infrastructure shall be <br />in accordance with HCC Chapter 21, Division 4, Sections 21-26 through 21-28. DEM agrees to <br />v/nck in good faith to execute the required steps outlined in the Code within nccosonably <br />cspcdieo1dooefrume. [)|GM agrees that assistance to ()LA in the performance of this Agreement <br />oba\| include, but not bc limited to, the following steps or phases: <br />4]. Assistance with State Historic Preservation Division. Within <br />reasonable time following of the sewer plans, the County will assist ()L/\`tothe extent <br />pomaU`|c, in u similar manner ue hwould any other contractor, by submitting to the l{uvvoi'i State <br />Historic Preservation Division ("S|{PO")oletter informing SBPIlofthe proposed Sewer <br />Infrastructure work within the DOT right nfway and seek Sf{PD'a determination that such work <br />will have "no effect" upon the Siaic`ahistoric resources; however, itisstrictly understood by all <br />parties that the County is not responsible for any State or local final determination regarding any <br />externally imposed requirements. <br />42. Construction of Sewer Infrastructure. The County and 0L&agree that <br />iothe event the Council approves the sewer line extension, and the County and OLA and DOT <br />execute Use and Occupancy Agreements for the Belt Line and OLA Line segments, OLA shall <br />undertake, at its expense, the construction and installation of the Sewer Infrastructure in <br />accordance with and subject to the following procedures and such other procedures as required <br />by law: <br />A. Contract Award. Upon the `m approval ofthe plans and <br />specifications for the Sewer Infrastructure Work and the DOT and County's execution of Use <br />and Occupancy Agreement No. 500for Sewer Force Main Purposes, orusimilar acceptable <br />document, OLA shall be authorized to award the Construction Contract, in conformity with this <br />Agreement, and prior to commencement of the work, OLA shall provide the County with the <br />Construction Contract and the bonds and insurance certificates required in Paragraph 3.1) and <br />[()}lGTCs()972),unless amended toulater date prior toContract execution. DLAaho}| use <br />best efforts to commence construction within one year after the construction plans and <br />specifications have been approved by DEM and DOT, and shall complete construction within <br />twelve (12) months of the Construction Contract execution date in accordance with the approved <br />construction plans and specifications, provided that this time period may be extended based on <br />force oo jcurccvonta. <br />B. County Inspection of Construction. DBM`aoudicipotion in <br />OL&`«construction of the Sewer Infrastructure shall belimited to approval of the plans and <br />specifications for such work and inspection of the work as it proceeds to ensure conformity with <br />the approved plans and specifications and compliance with DPW and DEM standards, in <br />accordance with HCC Section 21-18 and all other applicable federal, state and county laws, rules <br />and regulations. I)EM agrees totimely conduct its inspections as the construction work <br />progresses, to ensure that the work may progress in accordance with the Contractor's schedule. <br />0[Ashall cover the cost ofany change orders pertaining tothis project aadcsoribedhc,ciuood <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.