Laserfiche WebLink
the purpose of mitigating any adverse noise or visual impacts to adjacent <br />properties in accordance with the requirements of Planning Department's Rule <br />No. 17 (Landscaping Requirements) and Chapter 25 (Zoning Code), Hawaii <br />County Code. <br />C. Prior to the issuance of a Certificate of Occupancy, the Applicant shall submit the <br />anticipated maximum daily water usage calculations as prepared by a professional <br />engineer licensed in the State of Hawaii to the Department of Water Supply <br />(DWS) to determine if an additional or larger meter is necessary. <br />D. The Applicant shall construct necessary water system improvements as required <br />by the Department of Water Supply (DWS), which may include, but not be <br />limited to, the installation of a reduced pressure type backflow prevention <br />assembly, within 5 feet of the meter on private property, meeting with the <br />approval of DWS. <br />E. Prior to the issuance of a Certificate of Occupancy, the Applicant shall implement <br />any improvements required by the Fire Department and/or Department of Water <br />Supply to ensure that fire protection requirements can be met for the MCX <br />zoning. <br />F. Prior to the issuance of a Certificate of Occupancy, the Applicant shall secure and <br />finalize all building permits as required by the Department of Public Works <br />Building Division. <br />G. All earthwork and grading activity shall conform to Chapter 10, Erosion and <br />Sedimentary Control, of the Hawaii County Code. <br />