Laserfiche WebLink
The applicant's proposed development does not strictly adhere to the exceptions <br />for changing the current zoning in that it is not an agricultural cluster subdivision, and <br />although the applicant will be required to meet the County Housing Code for providing <br />affordable housing, the subdivision will include primarily market -rate lots. Additionally, <br />the proposed 5-lot subdivision slightly exceeds the 4 lots or less minimum mentioned in <br />the SKCDP. In 2021, when the applicant applied to change the state land use boundary <br />district to urban and zoning to RS-10 for the southern portion of the property, the <br />Leeward Planning Commission did not support the request because they believed the <br />southern portion of the property should not be urbanized since it is situated in the area <br />designated for small fanns and ranches in the SKCDP. The current applications align <br />more closely with the SKCDP related to preserving important open space and small <br />farms and ranches in this area of Waimea. <br />All essential utilities and services are available to the site. Access to the <br />property is proposed via Mamalahoa Highway and Ishihara Farm Road. Mamalahoa <br />Highway is a two-lane, paved roadway, striped with a two-way left turn lane in the <br />median of the road, with an approximate 40-foot-wide pavement within a 50-foot right- <br />of-way in this area. According to the Department of Public Works , Engineering Division <br />(DPW), the section of Mamalahoa Highway fronting the subject property was transferred. <br />from County to State ownership in December, 2021 and is now State-owned and <br />maintained. <br />The existing dwellings on the subject site are currently accessed by Ishihara Farm <br />Road, a private road over an approximately fifty -foot -wide combined easement within <br />Lots 11-A-2 and 11-A-3 in favor of the subject property (Lot I1-A-1). The new <br />residential lots will similarly be accessed by Ishihara Farm Road and by interior access <br />easements. The applicant is proposing two new access points from Mamalahoa Highway <br />to service the three proposed commercial lots with no vehicular access via Ishihara Farm <br />Road for the proposed commercial use. <br />A Traffic Impact Analysis Report (TZAR) was completed in September 2022 by <br />The Traffic Management Consultant (TMC). The TIAR was designed to study current <br />conditions of peak hour traffic data, evaluate traffic count data to establish existing traffic <br />-5- <br />