Laserfiche WebLink
A. The applicant, successors or assigns ("Applicant") shall be responsible for complying <br />with all of the stated conditions of approval all applicable County, State, and Federal <br />Laws, codes, rules, regulations, and requirements. <br />B. Final Subdivision Approval shall be secured within ten (10) years from the effective <br />date of this ordinance. <br />C. Prior to the issuance of a water commitment by the Department of Water Supply <br />(DWS), the Applicant shall submit the anticipated maximum daily water usage <br />calculations as prepared by a professional engineer licensed in the State of Hawaii to <br />the DWS. A water commitment deposit shall be paid to the DWS within 180 days <br />from the effective date of this ordinance in accordance with Rule 5 of the Department <br />of Water Supply's Rules and Regulations. The Applicant is responsible for <br />maintaining valid water commitments to support the proposed use until such time <br />that required water facilities charges are paid in full. <br />D. Prior to issuance of Final Subdivision Approval, the Applicant shall construct, or <br />cause to be constructed, necessary water improvements meeting with the approval <br />of the Department of Water Supply. <br />E. The plat map submitted for final subdivision approval shall delineate a fifty -foot - <br />wide road lot for the Ahe Street and Kikaha Street roadway extensions through the <br />subject property. These road lots shall be dedicated to the County upon request of the <br />Department of Public Works at no cost to the County. <br />F. Within the Ahe Street and Kikaha Street roadway lots, the applicant shall provide a <br />paved travel lane width of 16-feet and 2-foot-wide compacted gravel <br />shoulders/swales per DPW standard detail R-25, up to the southern property <br />boundary for the extension of Kikaha Street and the eastern property boundary for <br />the extension of Ahe Street. These improvements shall remain in private ownership <br />-3- <br />