My WebLink
|
Help
|
About
|
Sign Out
Home
BIL 030 Draft 01 2024-2026
ClerkCouncil
>
Council Records
>
Bills
>
2024-2026
>
BIL 030 Draft 01 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 4:30:19 PM
Creation date
2/21/2025 8:49:42 AM
Metadata
Fields
Template:
Bill/Resolution
Bill/Resolution - Type
BIL
Bill/Resolution - Council Term
2024-2026
Bill/Resolution
030
Draft
01
Introducer
Heather L. Kimball, Council Member
Referred To
LAAC
Action 1
LAAC: Amended to Draft 2 - 3/6/2025
Document Relationships
AGE LAAC 2025-03-06 2024-2026
(Related)
Path:
\Council Records\Agendas\2024-2026\Legislative Approvals and Acquisitions Committee (LAAC)
COM 0157.000 2024-2026
(Related)
Path:
\Council Records\Communications\2024-2026
REP LAAC 010 2025-03-06 2024-2026
(Related)
Path:
\Council Records\Reports\2024-2026\Legislative Approvals and Acquisitions Committee (LAAC)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Prior to the issuance of a water commitment by the Department of Water Supply <br />(DWS), the Applicants shall submit the anticipated maximum daily water usage <br />calculations as prepared by a professional engineer licensed in the State of <br />Hawaii to the DWS. A water commitment deposit shall be paid to the DWS in <br />accordance with Rule 5 of the Department of Water Supply's Rules and <br />Regulations. The Applicants are responsible for maintaining valid water <br />commitments to support the proposed use until such time that required water <br />facilities charges are paid in full. <br />C. The Applicants shall construct necessary water system improvements as required <br />by the Department of Water Supply (DWS), which includes, but may not be <br />limited to, the installation of a reduced pressure type backflow prevention <br />assembly, within 5 feet of the meter on private property, meeting with the <br />approval of DWS. <br />D. Construction of the proposed development shall be as substantially represented by <br />the Applicants, or as permitted by the zoning district classification, and shall be <br />completed within five (5) years from the effective date of this ordinance. The time <br />during which required plans, reports, studies, or relevant permit applications are <br />under review for approvals by government agencies shall not count towards the <br />deadline established in the ordinance. To justify this tolling, the Applicants shall <br />provide evidence of the excluded time period to the planning department for its <br />review and approval, which shall consist of dates obtained from a government <br />agency website, permitting program, or office indicating when the required plans, <br />reports, studies, or permit applications were submitted, approved, denied, or <br />returned by the government agency. Any request for tolling shall be verified and. <br />approved in writing by the director prior to the deadline established by the <br />ordinance. The director shall notify the council of any approval of a request for <br />tolling within thirty days of such approval. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.