My WebLink
|
Help
|
About
|
Sign Out
Home
ORD 2025-023 2024-2026
ClerkCouncil
>
Council Records
>
Ordinances
>
2025
>
ORD 2025-023 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2026 1:22:51 PM
Creation date
3/4/2025 3:54:55 PM
Metadata
Fields
Template:
Ordinances
Ordinances - Type
ORD
Ordinances - Council Term
2024-2026
Year
2025
Ordinance
023
Effective Date
3/4/2025
Document Relationships
BIL 015 Draft 02 2024-2026
(Related)
Path:
\Council Records\Bills\2024-2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
complying with all of the stated conditions of approval. <br />B. The applicant shall construct necessary water system improvements as required <br />by the Department of Water Supply (DWS), which may include, but not be <br />limited to, the installation of a reduced pressure type backflow prevention <br />assembly and improvements to meet DWS' commercial zoning fire flow standard <br />of 2,000 GPM at the site for fire protection. The applicant is responsible for <br />maintaining valid water commitments to support the proposed use until such time <br />that required water facilities charges are paid in full. The applicant shall comply <br />with all other applicable DWS policies and requirements. <br />C. Construction of the proposed improvements shall be completed within eight (8) <br />years from the effective date of this amended ordinance. [This <br />with the Zeiiing Code. Plans shall identify pr-oposed struetdr-e(s), fire pr-Oteefie.n. <br />ifidieated e the ..laps f the puTese f. ifig.,ting . petefAial a..o. � r <br />with the requirements of Planning Depattment's Rule No. 17 (handse � i - <br />]The time during which required plans, reports, studies, or relevant <br />permit applications are under review for approvals by government agencies shall <br />not count towards the deadline established in the ordinance. To justify this tolling, <br />the applicant shall provide evidence of the excluded time period to the planning <br />department for its review and approval, which shall consist of dates obtained from <br />a government agency website, permitting program, or office indicating when the <br />required plans, reports, studies, or permit applications were submitted, approved, <br />denied, or returned by the government agency, <br />D. The applicant shall secure Final Plan Approval from the Planning Director in <br />accordance with the Zoning Code. Plans for any new improvements shall identify <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.