Laserfiche WebLink
Annual Revenue Report- Fees, Rates & Other Charges <br /> Charge Frequency Date of Most <br /> Charge Authorization(Rules, Amount of Most Total Revenues Total Revenues Change %Change <br /> Fund Account No. Account Title Department/Division Description Charge (Annual,Monthly,Per Charter,etc.) Recent Recent Adjustment FY23 FY24 FY23-FY24 FY23-FY24 <br /> Use,etc.) Adjustment <br /> Garbage Disposals $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Grease Interceptors $ 12.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Sumps(Sewage) $ 12.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Interceptors(sand,dirt,etc.) $ 12.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Bldg Sewer or Drain Stubout $ 20.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Sanitary Drainage and/or Vent Piping $ 20.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Miscellaneous Fixtures $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Gas Piping(for install of gas appliances) $ 12.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Gas Piping System(Lab Equip or Other Misc) $ 12.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Gas Piping System(Ext Lamps,Luau,Torches,etc.) $ 12.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Broilers(Gas) $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Dryers $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Hot Plates $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Ovens $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Ranges $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Refrigerators $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> (Gas)Water Heater Gas Connection $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Fireplace $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> BBQ $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Miscellaneous Gas Appliances $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> For each additional medical gas inlets/outlets $ 4.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Penalty Fee for work started without permit $ 100.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> Re-Inspection Fee $ 50.00 Per Unit HCC§17-28 Adopted 2007 N/A <br /> TOTAL $ 7,024.00 $ 1,848.00 $ (5,176.00) -73.7% <br /> General 010.3202.06 Sign Permits Public Works-Building <br /> Sign Permits: <br /> Sign Fee $ 25.00 Per Sign HCC§3-24 Adopted 2004 N/A <br /> Penalty Fee $ 100.00 Per sign HCC§3-24 Adopted 2004 N/A <br /> $100 or 10%of total <br /> Sign Variance Fee value,whichever greater Per Plan HCC§3-24 Adopted 2004 N/A <br /> Administrative Enforcement-Civil Fine before date of the <br /> Order $ 500.00 each HCC§3-38(c)(3) Adopted 2004 N/A <br /> Administrative Enforcement-Daily beyond date of correction $ 100.00 Per Day HCC§3-38(c)(4) Adopted 2004 N/A <br /> TOTAL $ 5,220.90 $ 12,898.00 $ 7,677.10 147.0% <br /> General 010.3202.12 Grade,Grub,Stockpile Fee Public Works-Engineering <br /> Grade fee 0-100 cubic yards $5.00 Per Plan HCC§10-11(a) 1986 $ 3.00 <br /> $5 for the first 100 cubic <br /> yards plus$2 each addtl $3 increase for first 100 <br /> Grade fee 101-1,000 cubic yards 100 cubic yards Per Plan HCC§10-11(a) 1986 cubic yards <br /> $25 for the first 1,000 <br /> cubic yards plus$2 for <br /> each additional 1,000 $5 increase for first <br /> Grade fee 1,001-10,000 cubic yards cubic yards Per Plan HCC§10-11(a) 1986 1,000 cubic yards <br /> $41 for the first 10,000 <br /> cubic yards plus$2 per $3 increase for the first <br /> Grade fee 10,001 cubic yards or more 1,000 addtl cubic yards Per Plan HCC§10-11(a) 1986 10,000 cubic yards <br /> Page 7 <br />