Laserfiche WebLink
(B) Before and after photo simulations from various locations and/or angles <br />from which the public would typically view the site; and <br />(C) A map depicting where the photos were taken. <br />The visual impact analysis shall demonstrate that less intrusive sites are <br />not available or do not provide the necessary communication coverage to <br />provide the service. The director may request the submission of additional <br />materials includinjz but not limited to photo overlays, scaled models, <br />renderings or field mock-ups to evaluate potential visual impacts. These <br />materials should address appropriate coloration, blending, and stealth design <br />(e mono -pine, monopalm) to harmonize the facility with the surrounding <br />area." <br />SECTION 6. Chapter 25, article 2, division 7, section 25-2-76, of the Hawaii County <br />Code 1983 (2016 Edition, as amended), is amended to read as follows: <br />"Section 25-2-76. Action on plan approval application. <br />(a) The director may issue plan approval subject to conditions or changes in the <br />proposal which, in the director's opinion, are necessary to carry out and further the <br />purposes of this chapter and the considerations contained in section 25-2-77. <br />(b) The director may only issue plan approval for a telecommunication antenna or <br />tower if the proposed use meets all of the conditions contained in sections 25-2-77 <br />and 25-4-12, and if the applicant provides all verification required under section 25- <br />2-74. <br />(c) The director may only issue plan approval for a temporary model home or real <br />estate office if the proposed use meets all of the conditions in section 25-2-77 and <br />25-4-8. <br />(d) The director shall render a decision to either approve or deny a plan approval <br />application, other than for an agricultural tourism facility [of]S any special district <br />with adopted design guidelines and/or standards, or M telecommunication antenna <br />or tower, within thirty days after acceptance of the application. If the director fails <br />to render a decision within the thirty -day period, the application shall be considered <br />approved without further certification by the director. In addition, the following <br />specific provisions shall apply: <br />(1) For an agricultural tourism facility, the department shall conduct a site <br />inspection prior to issuing plan approval within sixty days after acceptance of <br />the application. If the director fails to render a decision within the sixty-day <br />period, the application shall be considered approved without further <br />certification by the director. <br />(2) For any plan approval application within a special district with adopted design <br />guidelines and/or standards, the director shall render a decision to either <br />approve or deny the plan approval application within forty-five days after <br />acceptance of the application. If the director fails to render a decision within <br />the forty-five day period, the application shall be considered approved without <br />further certification by the director. <br />(3) For a telecommunication antenna or tower, the director shall render a decision <br />