My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0361.000 2024-2026
ClerkCouncil
>
Council Records
>
Communications
>
2024-2026
>
COM 0361.000 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 9:04:51 AM
Creation date
6/24/2025 2:43:06 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2024-2026
Communication
0361
Point
000
Author
Diane Nakagawa, Director of Finance
Communications - Referred To
PCHSW
Document Relationships
AGE COUNCIL 2025-07-23 2024-2026
(Related To)
Path:
\Council Records\Agendas\2024-2026\Council
AGE PCHSW 2025-07-08 2024-2026
(Related)
Path:
\Council Records\Agendas\2024-2026\Policy Committee on Health, Safety, and Well-being (PCHSW)
REP PCHSW 002 2025-07-08 2024-2026
(Related)
Path:
\Council Records\Reports\2024-2026\Policy Committee on Health, Safety, and Well-being (PCHSW)
RES 227 Draft 01 2024-2026
(Related To)
Path:
\Council Records\Resolutions\2024-2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HU Public Works r NIA Walluku Bridge #1 over 'in progress Wailuku Bridge #1- V WA NIA <br />Waltuku River on ANottce of Intern <br />Walnaku Street is an for Hazard <br />essential part of the Mitigation Grant r <br />Program funding f <br />traffic network In the was submitted and <br />area as it serves as a approved to move ! <br />detour or important totheapplicatlon ' <br />alternate route for stage. The Finance <br />Highway 19. The ! <br />Department Is <br />existing 129-foot, 2 <br />&atuatingfunding <br />span concrete bridge <br />feasibility before <br />moving forward. <br />was built in 1919 and <br />Walanuenue Ave <br />Is not in compliance <br />Bridge —Phase 1 <br />with today's <br />(preliminary <br />engineering design <br />design, <br />standards, specif[catty <br />environmental, etc) <br />In regard to resisting <br />completed; <br />currently working to <br />seismic forces. <br />getPhase2(final <br />design, <br />construction) <br />approvedand <br />funded. <br />1 <br />TETRA TECH <br />l _�1 21-26 2025 Hawaii County Hazard Mitigation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.