My WebLink
|
Help
|
About
|
Sign Out
Home
COM 0361.000 2024-2026
ClerkCouncil
>
Council Records
>
Communications
>
2024-2026
>
COM 0361.000 2024-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 9:04:51 AM
Creation date
6/24/2025 2:43:06 PM
Metadata
Fields
Template:
Communications
Communications - Type
COM
Communications - Council Term
2024-2026
Communication
0361
Point
000
Author
Diane Nakagawa, Director of Finance
Communications - Referred To
PCHSW
Document Relationships
AGE COUNCIL 2025-07-23 2024-2026
(Related To)
Path:
\Council Records\Agendas\2024-2026\Council
AGE PCHSW 2025-07-08 2024-2026
(Related)
Path:
\Council Records\Agendas\2024-2026\Policy Committee on Health, Safety, and Well-being (PCHSW)
REP PCHSW 002 2025-07-08 2024-2026
(Related)
Path:
\Council Records\Reports\2024-2026\Policy Committee on Health, Safety, and Well-being (PCHSW)
RES 227 Draft 01 2024-2026
(Related To)
Path:
\Council Records\Resolutions\2024-2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HC7 Oepartmentof <br />Water Supply <br />9 <br />N/A <br />The project requires 3Noprogress <br />Progresses <br />y <br />the Improvements to <br />; dependent upon <br />'address the stability of <br />project funding. <br />the embankments as ° <br />r` <br />well as the <br />waterproofing of the <br />reservoir itself. The <br />embankments are <br />t <br />r <br />being improved by <br />wideningthe base of <br />., <br />the embankment and s <br />- <br />y <br />N <br />` <br />Increasing the overall <br />strength supportingthe� <br />reservairwalls. An• <br />underdrain at the toe <br />` <br />of the embankment is,. <br />also being installed to <br />direct groundwater <br />,away fr'omthe' <br />lembankment'to <br />.¢fmiriimize the chances <br />j <br />,tof Uquefactlon. Also', <br />waterproofingthe <br />t <br />resenrolrwill be' <br />- <br />,accompUshed by <br />NinstalUng a synthetic <br />line- Z which eUminates <br />i <br />the possibility of leaks <br />throughthenumerous <br />cracks in the concrete <br />panels lining the <br />Interior of the <br />WA <br />I <br />NIA <br />IN TETRA TECH <br />21.29 2025 Hawail County Hazard Mitigation Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.